Summary
Project includes the construction of approx., 0.8 miles of concrete pathway, 90' of approaches and 25' of culvert extensions. Work includes mobilization & bonding 1 LS: temporary traffic control 11 LS; unclassified excavation above subgrade 1,106 CY; excavation below subgrade 236 CY; topsoil stripping and stockpiling (6" depth) 1737 SY; topsoil placing 2014 SY; seeding 2014 SY; restoration of gravel surface 108 SY; field restoration 93 SY; crushed aggregate base course 526 CY; restoration of asphalt surface 357 SY; stop bars 38 LF: pedestrian crossing stripes 384 SF; underground utility crossings 5 EA; underground utility identification 15 EA; lower existing utility 1885 LF: sign and post installation 20 EA. See attached file.