Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of cross beams in the turbine chamber, and replacement of a corroded, non-historical arm on the turbine. The renovation, repair and reconstruction of the turbine tailrace tunnel entrance headwall and wingwalls.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes tunnel piping and chiller replacement.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
Work includes tunnel piping and chiller replacement.
AvailablePremium
Access the largest public sector contact database
Project work consists of timber bridge replacement.
Posted Date
Nov 27, 2025
Due Date
Dec 18, 2025
Release: Nov 27, 2025
Close: Dec 18, 2025
Project work consists of timber bridge replacement.
AvailableTunnel cap repair. Work include cast-in-place concrete, structural steel framing, electrical, lighting, on-grade concrete. See attached files.
Posted Date
Dec 5, 2025
Due Date
Jan 22, 2026
Release: Dec 5, 2025
Close: Jan 22, 2026
Tunnel cap repair. Work include cast-in-place concrete, structural steel framing, electrical, lighting, on-grade concrete. See attached files.
AvailableWork consists of replace the tunnel's carbon monoxide monitoring system and filters. Filters for replacement are located in the tunnel along the ceiling panels while the co monitoring system equipment and plc is located in the electrical substation building located atop the tunnel on horace j. Bryant jr. Drive in atlantic city. Maintenance and protection of traffic will be required for filter replacement work performed in the tunnel.
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Close: Dec 17, 2025
Work consists of replace the tunnel's carbon monoxide monitoring system and filters. Filters for replacement are located in the tunnel along the ceiling panels while the co monitoring system equipment and plc is located in the electrical substation building located atop the tunnel on horace j. Bryant jr. Drive in atlantic city. Maintenance and protection of traffic will be required for filter replacement work performed in the tunnel.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis