Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project work consists of timber bridge replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Seeking bids to furnish the following timber bridge, culvert, and salt storage building materials and combinations of materials complete with all necessary hardware and fasteners in a complete package including sealed design drawings for the erection of the timber structure.
Posted Date
Dec 5, 2025
Due Date
Jan 5, 2026
Release: Dec 5, 2025
Close: Jan 5, 2026
Seeking bids to furnish the following timber bridge, culvert, and salt storage building materials and combinations of materials complete with all necessary hardware and fasteners in a complete package including sealed design drawings for the erection of the timber structure.
Premium
Access the largest public sector contact database
Project work consists of bridge replacement.
Posted Date
Nov 27, 2025
Due Date
Dec 18, 2025
Release: Nov 27, 2025
Close: Dec 18, 2025
Project work consists of bridge replacement.
AvailableTDOT seeks proposals for the design-build replacement of eleven timber bridges in Haywood and Lauderdale counties, Tennessee. The project involves preconstruction coordination, design, and construction work, with specific goals to minimize road closure durations, project costs, and utility impacts. Proposals must include technical and price components, and adhere to TDOT's environmental and quality standards.
Posted Date
Oct 6, 2025
Due Date
Dec 16, 2025
Release: Oct 6, 2025
Close: Dec 16, 2025
TDOT seeks proposals for the design-build replacement of eleven timber bridges in Haywood and Lauderdale counties, Tennessee. The project involves preconstruction coordination, design, and construction work, with specific goals to minimize road closure durations, project costs, and utility impacts. Proposals must include technical and price components, and adhere to TDOT's environmental and quality standards.
Bridge replacement - precast reinforced concrete 3-sided structure.
Posted Date
Nov 17, 2025
Due Date
Jan 14, 2026
Release: Nov 17, 2025
Close: Jan 14, 2026
Bridge replacement - precast reinforced concrete 3-sided structure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis