Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The scope of work mainly consists of the installation of a replacement emergency generator at High School. The existing generator will be removed by the contractor, and the new generator will be furnished by the owner
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of the emergency generator serving the Monico Emergency Management tower site.
Posted Date
Dec 2, 2025
Due Date
Jan 30, 2026
Release: Dec 2, 2025
Close: Jan 30, 2026
Replacement of the emergency generator serving the Monico Emergency Management tower site.
AvailableOptional Emergency Stand-by Generator Replacement.
Posted Date
Dec 12, 2025
Due Date
Jan 21, 2026
Release: Dec 12, 2025
Close: Jan 21, 2026
Optional Emergency Stand-by Generator Replacement.
AvailableWork consists of: replacing the existing 250 kilowatt exterior generator serving rita tallent picken regional center for the arts and humanities on the uw-parkside campus. The existing generator and associated accessories, components, conductors, etc. Shall be demolished and replaced with new, as described within the project documents. The new generator is sized and rated to match the existing genset specification. Existing conduit paths, raceway, pull and junction boxes shall be salvaged and protected for the installation of new conductors between the new generator and existing downstream distribution equipment.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Work consists of: replacing the existing 250 kilowatt exterior generator serving rita tallent picken regional center for the arts and humanities on the uw-parkside campus. The existing generator and associated accessories, components, conductors, etc. Shall be demolished and replaced with new, as described within the project documents. The new generator is sized and rated to match the existing genset specification. Existing conduit paths, raceway, pull and junction boxes shall be salvaged and protected for the installation of new conductors between the new generator and existing downstream distribution equipment.
AvailablePSU prospect hall chiller replacement.
Posted Date
Dec 19, 2025
Due Date
Jan 26, 2026
Release: Dec 19, 2025
Close: Jan 26, 2026
PSU prospect hall chiller replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →