Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Thornton
Design, permitting, supply and turnkey installation of a rooftop and ground‑mounted solar photovoltaic (PV) system (approx. 460–520 kW DC) at the Thornton Water Treatment Plant.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Thornton
Project includes Water Treatment Plant.
Posted Date
Dec 1, 2025
Due Date
Dec 17, 2025
Release: Dec 1, 2025
City of Thornton
Close: Dec 17, 2025
Project includes Water Treatment Plant.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Somerton
Work consists of rehabilitation of filter tanks at water treatment plant. The goal of this project is to restore the filtration system to full operational condition, ensure continued reliability and water quality, and complete all work with minimal disruption to plant operations and water service.
Posted Date
Nov 20, 2025
Due Date
Jan 19, 2026
Release: Nov 20, 2025
City of Somerton
Close: Jan 19, 2026
Work consists of rehabilitation of filter tanks at water treatment plant. The goal of this project is to restore the filtration system to full operational condition, ensure continued reliability and water quality, and complete all work with minimal disruption to plant operations and water service.
AvailableHalifax County Service Authority
Halifax County Service Authority seeks bids to expand and upgrade the Leigh Street Water Treatment Plant in South Boston, Virginia, including membrane filtration, storage tanks, pump stations, instrumentation, and site/architectural upgrades. The project goal is to increase capacity and enhance operational efficiency and reliability in line with public health standards.
Posted Date
Nov 13, 2025
Due Date
Jan 8, 2026
Release: Nov 13, 2025
Halifax County Service Authority
Close: Jan 8, 2026
Halifax County Service Authority seeks bids to expand and upgrade the Leigh Street Water Treatment Plant in South Boston, Virginia, including membrane filtration, storage tanks, pump stations, instrumentation, and site/architectural upgrades. The project goal is to increase capacity and enhance operational efficiency and reliability in line with public health standards.
AvailableCity of Opelika
Project include water treatment plant.
Posted Date
Dec 1, 2025
Due Date
Jan 15, 2026
Release: Dec 1, 2025
City of Opelika
Close: Jan 15, 2026
Project include water treatment plant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →