Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Thornton
Project includes Water Treatment Plant.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Thornton
Design, permitting, supply and turnkey installation of a rooftop and ground‑mounted solar photovoltaic (PV) system (approx. 460–520 kW DC) at the Thornton Water Treatment Plant.
Posted Date
Dec 1, 2025
Due Date
Dec 11, 2025
Release: Dec 1, 2025
City of Thornton
Close: Dec 11, 2025
Design, permitting, supply and turnkey installation of a rooftop and ground‑mounted solar photovoltaic (PV) system (approx. 460–520 kW DC) at the Thornton Water Treatment Plant.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Knoxville Utilities Board (KUB)
Water Treatment Plant Raw Water and Clarification Improvements CMAR.
Posted Date
Nov 7, 2025
Due Date
Dec 17, 2025
Release: Nov 7, 2025
Knoxville Utilities Board (KUB)
Close: Dec 17, 2025
Water Treatment Plant Raw Water and Clarification Improvements CMAR.
AvailablePiute County
Provide equipment and ongoing maintenance services for a pilot water treatment plant.
Posted Date
Nov 26, 2025
Due Date
Dec 16, 2025
Release: Nov 26, 2025
Piute County
Close: Dec 16, 2025
Provide equipment and ongoing maintenance services for a pilot water treatment plant.
AvailableNorth Clackamas County Water Commission
Provide construction manager/general contractor (CM/GC) services including preconstruction to replace or repair several key facilities within a 20 mgd wholesale drinking water treatment plant located along the Clackamas River.
Posted Date
Dec 2, 2025
Due Date
Jan 8, 2026
Release: Dec 2, 2025
North Clackamas County Water Commission
Close: Jan 8, 2026
Provide construction manager/general contractor (CM/GC) services including preconstruction to replace or repair several key facilities within a 20 mgd wholesale drinking water treatment plant located along the Clackamas River.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →