Summary
Work includes consisting on the replacement of pre-existing imaging equipment and infrastructure components. In room 1-060 control booth, removal of existing fixed counter and built-in wall casework. In room 1-062 staging area, removal of med gasses on west wall, removal of existing built-in casework and hand washing sink, modifying the plumbing to eliminate foot pedal hot and cold water control valves, and demolition/finish of wall to control room, per plan. In room 1-063 procedure room, installation of a new ge allia igs740 system, including: demolition of a section of the existing concrete slab, a new thickened concrete footing to support new imaging modality and placing of equipment], trenching to create new underground pathways supporting power and signal cabling for the new modality; etc, see outside link.