Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes : 1,800 SF building addition including a 2-stop elevator, associated lobby, (4) single-user restrooms and storage room. Building consists of slab on grade foundation, fire retardant treated wood framed walls clad with eifs, wood framed roof & floor structure with single ply membrane system over tapered rigid insulation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
DESIGN-BUILD: Design and construction of a 32' x 65' pole building extension for the city. Components of the construction include: site grading; setting posts on a concrete foundation; concrete floor; wood wall and trusses; steel siding and roofing; doors; and electrical. In addition, the City of Greenville desires to include two rafter-supported garment storage and conveyance systems as an additive alternate to the bid.
Posted Date
Dec 6, 2025
Due Date
Jan 13, 2026
Release: Dec 6, 2025
Close: Jan 13, 2026
DESIGN-BUILD: Design and construction of a 32' x 65' pole building extension for the city. Components of the construction include: site grading; setting posts on a concrete foundation; concrete floor; wood wall and trusses; steel siding and roofing; doors; and electrical. In addition, the City of Greenville desires to include two rafter-supported garment storage and conveyance systems as an additive alternate to the bid.
Premium
Access the largest public sector contact database
Provide building renovation.
Posted Date
Nov 28, 2025
Due Date
Dec 18, 2025
Release: Nov 28, 2025
Close: Dec 18, 2025
Provide building renovation.
AvailableBuilding and Material Testing Consultant for the Aki Kurose Middle School (AKMS) Modernization & Addition Project.
Posted Date
Nov 25, 2025
Due Date
Dec 19, 2025
Release: Nov 25, 2025
Close: Dec 19, 2025
Building and Material Testing Consultant for the Aki Kurose Middle School (AKMS) Modernization & Addition Project.
AvailableThe State University Construction Fund is seeking statements of qualifications from firms to provide Construction Manager (CM) Agency – Construction Phase Services for the Rehab Natural Science Building Phase 2 – Addition at SUNY Old Westbury. The project includes a new two-story 17,000 GSF addition and subsequent renovation of the existing 63,307 GSF Natural Sciences Building with new teaching labs and associated systems; the estimated construction budget is approximately $29,242,000. Consultants must register on the Fund’s procurement site to receive the RFQ and submission link; required SOQs must be submitted electronically by the deadline per the RFQ instructions.
Posted Date
Nov 21, 2025
Due Date
Dec 17, 2025
Release: Nov 21, 2025
Close: Dec 17, 2025
The State University Construction Fund is seeking statements of qualifications from firms to provide Construction Manager (CM) Agency – Construction Phase Services for the Rehab Natural Science Building Phase 2 – Addition at SUNY Old Westbury. The project includes a new two-story 17,000 GSF addition and subsequent renovation of the existing 63,307 GSF Natural Sciences Building with new teaching labs and associated systems; the estimated construction budget is approximately $29,242,000. Consultants must register on the Fund’s procurement site to receive the RFQ and submission link; required SOQs must be submitted electronically by the deadline per the RFQ instructions.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis