Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 6,000 LF of 16" waterline. Additional waterline installation activities include furnishing and installing five new fire hydrant assemblies - two to three air relief valves - and an automatic flushing device and discharge line; disinfecting and testing of new waterline and subsequent connection to existing water main; and disconnecting and decommissioning of 10" existing waterline operated and maintained. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes extension of 12" off-site waterline.
Posted Date
Dec 16, 2025
Due Date
Jan 15, 2026
Release: Dec 16, 2025
Close: Jan 15, 2026
Work includes extension of 12" off-site waterline.
AvailableRight-of-way agent services for waterline extension project.
Posted Date
Dec 18, 2025
Due Date
Jan 16, 2026
Release: Dec 18, 2025
Close: Jan 16, 2026
Right-of-way agent services for waterline extension project.
AvailableWork includes 1900 LF, furnish and install reinforced filter fabric barrier, complete in place; 112 SY, furnish and install stabilized construction access, complete in place; 803 LF, site restoration; 803 LF, furnish and install trench safety system for water line construction, complete in place; 596 LF, furnish and install 12IN dia. waterline by open cut, including all bends, fittings, valves, and appurtenances, complete in place; 167 LF, furnish and install 12 IN dia. waterline by open cut with restrained joints including all bends, fittings, valves, and appurtenances, complete in place; 120 LF, 12 IN dia. fusible PVC pipe waterline in 24 IN HDPE casing by trenchless construction, including all bends, fittings, complete in place. See attached files.
Posted Date
Jan 7, 2026
Due Date
Jan 28, 2026
Release: Jan 7, 2026
Close: Jan 28, 2026
Work includes 1900 LF, furnish and install reinforced filter fabric barrier, complete in place; 112 SY, furnish and install stabilized construction access, complete in place; 803 LF, site restoration; 803 LF, furnish and install trench safety system for water line construction, complete in place; 596 LF, furnish and install 12IN dia. waterline by open cut, including all bends, fittings, valves, and appurtenances, complete in place; 167 LF, furnish and install 12 IN dia. waterline by open cut with restrained joints including all bends, fittings, valves, and appurtenances, complete in place; 120 LF, 12 IN dia. fusible PVC pipe waterline in 24 IN HDPE casing by trenchless construction, including all bends, fittings, complete in place. See attached files.
Construction of approx 11,070 LF of 20" waterline and associated appurtenances. The project includes approx 40 LF casing pipe installed by jack-and-bore, and approx 1,270 LF of hdpe pipe installed by directional drill.
Posted Date
Dec 2, 2025
Due Date
Jan 15, 2026
Release: Dec 2, 2025
Close: Jan 15, 2026
Construction of approx 11,070 LF of 20" waterline and associated appurtenances. The project includes approx 40 LF casing pipe installed by jack-and-bore, and approx 1,270 LF of hdpe pipe installed by directional drill.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis