Summary
Project generally consists of the reconstruction, rehabilitation, and expansion of the existing asphalt terminal apron. Rehabilitation efforts include mill and asphalt overlay of approx. 68,500 SF of existing asphalt apron pavement, including joint and crack repair, and full depth reconstruction of the remaining approx. 36,000 SF of the existing asphalt apron. An approx. 26,000 SF asphalt apron expansion is proposed to accommodate FAA standard aircraft access, and aircraft tie-down spaces. Also included in the Base Bid is replacement of the medium intensity incandescent edge lighting with new medium intensity LED taxiway edge lighting, including new conduit, cable, counterpoise, duct bank, and regulator replacement. Installation and replacement of underdrain, and aircraft tie-down anchors, as well as new pavement markings, are also included in the base bid project.