Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of approximately 4,162 linear feet of 5-foot wide sidewalk construction along Route HH and Chapel Road in Carthage, Missouri.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of sidewalk improvements. Includes, 1,703 SY of type "A" sidewalk; 432 SY of type "B" sidewalk; 228 TON of compacted crushed stone; 177 SY of concrete street crossing; 152 SF of construction signs; 131 SF of tactile warning surface; 100 LF of 24" white stop bar; 82 SY of modot type 1-A curb ramp; 51 SF of signage; 46 LF of 18" rcp; 33 CY of class 3 excavation; 27 SY of modot type 1-B curb ramp; 12 LF of curb & gutter; 10 LF of 24" rcp; 8 CY of rock lining; removal of improvements.
Posted Date
Mar 30, 2025
Due Date
Jan 27, 2026
Release: Mar 30, 2025
Close: Jan 27, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of sidewalk improvements. Includes, 1,703 SY of type "A" sidewalk; 432 SY of type "B" sidewalk; 228 TON of compacted crushed stone; 177 SY of concrete street crossing; 152 SF of construction signs; 131 SF of tactile warning surface; 100 LF of 24" white stop bar; 82 SY of modot type 1-A curb ramp; 51 SF of signage; 46 LF of 18" rcp; 33 CY of class 3 excavation; 27 SY of modot type 1-B curb ramp; 12 LF of curb & gutter; 10 LF of 24" rcp; 8 CY of rock lining; removal of improvements.
Mill and replace/ Bituminous asphalt resurfacing of Harrison Street with ADA approved sidewalk.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
Mill and replace/ Bituminous asphalt resurfacing of Harrison Street with ADA approved sidewalk.
AvailableWork includes sidewalks construction.
Posted Date
Dec 17, 2025
Due Date
Jan 12, 2026
Release: Dec 17, 2025
Close: Jan 12, 2026
Work includes sidewalks construction.
AvailableRepair of Cement Concrete Sidewalks.
Posted Date
Jan 3, 2026
Due Date
Jan 22, 2026
Release: Jan 3, 2026
Close: Jan 22, 2026
Repair of Cement Concrete Sidewalks.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →