Retrieving RFP details
Release
Close
Tanglewood Nature Center Museum Offices
Work includes construction of a canopy walkway (phoenix experiential designs); selective tree/brush clearing; entrance, emergent tower and pond view platforms; 685 LF of fixed bridge w/ railings; 100 LF of suspension bridge w/ railings; nine (9) - two column supports; six (6) - three column supports; site plan elements (labella associates) includes driveway and parking improvements; 8' wide trail from parking to canopy (portion is elevated boardwalk); electric service to canopy from museum; stormwater management; lighting and landscaping.
Tanglewood Nature Center Canopy Walkway Project Bid
zip
City of Cincinnati
Provide demolition of the elevated walkway from the town center garage to the attached office building (cet). The project consists of the removal of the elevated walkway that connects the town center garage and the cet building.
City of Philadelphia
Provide one pop-up canopy 10' x 10' frame material steel or aluminum instant setup storage bag for travel roof material polyester - flame uv and water resistant. Stake anchors provided for added stability. Height adjustable and one canopy weights disc weights 10lbs each - 4 total.
NJ Division of Property Management & Construction
Project is for the selective removal of the existing wood siding from the nature center to remove and replace damaged sheathing and sister the existing wall framing as required. Rehabilitation of the existing exterior windows is also included to provide a weathertight construction.
Release
Sep 21, 2025
Close
Oct 30, 2025