Construct a pre-engineered metal building, install owner-furnished granular activated carbon (GAC) pressure vessels and media, and replace three groundwater well pumps.
What to Include In Your Proposal
Starbridge can help you:
✓
Pain points mentioned in board meetings and strategic plans
✓
Instantly outline and draft all requirements
✓
Bring in your USPs and exploit competitor gaps
Win These Opportunities Next
Starbridge can help you:
✓
Get ahead of RFPs — target accounts planning budget or ending contracts soon
✓
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
✓
Starbridge.ai books 30 - 40% of leads into meetings
Files
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
To conducting drinking water analyses on public drinking water systems for Per- and polyfluoroalkyl substances (PFAS) using the analytical methods. Services to include all necessary documentation, work, and equipment to perform drinking water sample analyses for South Carolina’s public water systems for the PFAS as listed in the National Primary Drinking Water Regulations (NPDWR).
To conducting drinking water analyses on public drinking water systems for Per- and polyfluoroalkyl substances (PFAS) using the analytical methods. Services to include all necessary documentation, work, and equipment to perform drinking water sample analyses for South Carolina’s public water systems for the PFAS as listed in the National Primary Drinking Water Regulations (NPDWR).
Work consists of 1 LS B01 - Treatment Building – Process Mechanical; 1 LS Coatings; 1 LS Electrical and Instrumentation; 3 EA P01 - PFAS Treatment Pressure Vessel Pairs and Appurtenances, Excluding Media; 240,000 Lbs P01- PFAS Treatment Media; 1 LS P02 - Rinse Water Tank; 1 LS U04/U05 - Grinder Pump and Grinder Pump Flow Meter Vault.
Work consists of 1 LS B01 - Treatment Building – Process Mechanical; 1 LS Coatings; 1 LS Electrical and Instrumentation; 3 EA P01 - PFAS Treatment Pressure Vessel Pairs and Appurtenances, Excluding Media; 240,000 Lbs P01- PFAS Treatment Media; 1 LS P02 - Rinse Water Tank; 1 LS U04/U05 - Grinder Pump and Grinder Pump Flow Meter Vault.
Work consists of the following major items: construction of a 1.58 mgd pfas water treatment plant (wtp) housing pfas filter vessels at the existing oak street WTP facility site. The new building will be approximately 5,376 SF constructed of masonry walls, precast columns, precast plank roof, and is inclusive of process, HVAC, plumbing, electrical, instrumentation, and SCADA. Modified and new site piping, site work for drainage, water, sewer, electrical, and all site/civil improvements. Related work to integrate the new building with the existing WTP facility including but not limited to piping, masonry, chemical feed, electrical and SCADA, as well as all associated appurtenances. Construction of an approx 450 SF building addition for chemical feed system improvements at the existing WTP building.
Work consists of the following major items: construction of a 1.58 mgd pfas water treatment plant (wtp) housing pfas filter vessels at the existing oak street WTP facility site. The new building will be approximately 5,376 SF constructed of masonry walls, precast columns, precast plank roof, and is inclusive of process, HVAC, plumbing, electrical, instrumentation, and SCADA. Modified and new site piping, site work for drainage, water, sewer, electrical, and all site/civil improvements. Related work to integrate the new building with the existing WTP facility including but not limited to piping, masonry, chemical feed, electrical and SCADA, as well as all associated appurtenances. Construction of an approx 450 SF building addition for chemical feed system improvements at the existing WTP building.