Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consists of removing sharp curve and realignment of Avenue and County Street and widening to provide exclusive left and right turn lanes. The work also includes aggregate base, asphalt concrete, street light conduit and junction boxes, pavement marking, signing, and other related work. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of restriping the crosswalks, installation of signs, and other related work. Work includes, 1,673 LF of waterborne-type ii pavement marking (painted) (white); 459 LF of obliterate pavement marking (stripe); 35 LF of miscellaneous work (repaint curb); 11 LF of sign post (perforated) (2 s). See attached files.
Posted Date
Nov 6, 2025
Due Date
Jan 30, 2026
Release: Nov 6, 2025
Close: Jan 30, 2026
Work consists of restriping the crosswalks, installation of signs, and other related work. Work includes, 1,673 LF of waterborne-type ii pavement marking (painted) (white); 459 LF of obliterate pavement marking (stripe); 35 LF of miscellaneous work (repaint curb); 11 LF of sign post (perforated) (2 s). See attached files.
AvailableThe proposed work consists of shifting the northbound and southbound roadways and associated ramps to the outside, shifting eastbound roadway and the associated ramps near the system traffic interchange outside, and constructing a new direct high occupancy vehicle ((DHOV)) ramp roadway and bridge, constructing two new bridges for a new connection, retaining walls, drainage, signing, pavement marking, lighting, landscaping, and other related work; Also includes 1,247 LF of removal of concrete curb; 54 CY of drainage excavation, 139 LF of jacking, boring or tunneling pipe; see attached files.
Posted Date
Jun 25, 2025
Due Date
Jan 30, 2026
Release: Jun 25, 2025
Close: Jan 30, 2026
The proposed work consists of shifting the northbound and southbound roadways and associated ramps to the outside, shifting eastbound roadway and the associated ramps near the system traffic interchange outside, and constructing a new direct high occupancy vehicle ((DHOV)) ramp roadway and bridge, constructing two new bridges for a new connection, retaining walls, drainage, signing, pavement marking, lighting, landscaping, and other related work; Also includes 1,247 LF of removal of concrete curb; 54 CY of drainage excavation, 139 LF of jacking, boring or tunneling pipe; see attached files.
Work consists of: removal of existing water treatment equipment and installation of new water treatment equipment at four buildings including piping additions, yard piping and surface restoration.
Posted Date
Nov 7, 2025
Due Date
Feb 3, 2026
Release: Nov 7, 2025
Close: Feb 3, 2026
Work consists of: removal of existing water treatment equipment and installation of new water treatment equipment at four buildings including piping additions, yard piping and surface restoration.
AvailableWork consist of demolition, asphalt driveway, yard piping, tank drain assembly, pump building interior piping assembly, vertical turbine pumps, sodium hypochlorite pump skid and chemical storage, caustic pump skid and chemical storage, generator, fuel system improvements, mechanical HVAC improvements, electrical improvements, structural improvements, 500,000 gallon ground storage tank, bypass operations.
Posted Date
Sep 2, 2025
Due Date
Mar 6, 2026
Release: Sep 2, 2025
Close: Mar 6, 2026
Work consist of demolition, asphalt driveway, yard piping, tank drain assembly, pump building interior piping assembly, vertical turbine pumps, sodium hypochlorite pump skid and chemical storage, caustic pump skid and chemical storage, generator, fuel system improvements, mechanical HVAC improvements, electrical improvements, structural improvements, 500,000 gallon ground storage tank, bypass operations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis