Ventura County Office of Education
School DistrictCA
Posted
Oct 14, 2026
Nov 18, 2026
Gateway Community School Modernization Project RFP
Work consists of school modernization project.
Description: Project includes Construction of a new 2-story building with an MPR, Music Classrooms, Student and Staff Dining, Food Service, Student Store, Special Education and General Classrooms, a Lunch Shelter, and a Trash / Transformer / Battery Storage enclosure consisting of all associated site and utility improvements related to the new building. To prepare for the new building, a Make Ready phase will include the demolition of existing buildings and canopies (Building 19, 20 and MPR building / Lunch Shelter), construction of LADWP Yard and Chiller, construction of a separate LAUSD Electrical, installation of new Substations and distribution boards, new feeders to existing substations, and all associated sitework including trenching for underground utilities, new concrete paving, and new fencing. Installation of an Interim Housing site will include the removal of two existing modular classrooms, one Food Service / Scramble modular building, one Restroom modular building, one Classroom modular building, one Student Store building, one smaller Restroom modular building, construction of one trash enclosure, interim refrigerator and freezer, and associated site improvements and utility work. Adjacent to the Interim Housing location, the addition of one permanent lunch shelter will be constructed consisting of all associated site work including paving, fencing, gates, switch gear, and fire lane extension. Throughout the duration of the project, accessibility upgrades will be completed which include existing classrooms, restrooms, locker rooms, showers, drinking fountains, sinks, signage, doors, casework without low counters at Buildings 1, 2, 3, 4, 5, 16, 21, 22, 23, 25, 29, 31 and 32. At the end of the project, the existing buildings, site walls, and canopies will all be repainted and Lots 1, 1A, and 3 will be restriped. Bid Packages (include but not limited to): Movers, SWPPP, GPR and Potholing, Surveying, Abatement, Demolition, Rebar, Structural Concrete, Masonry, Structural Steel, Metal Decking, Miscellaneous Metals, Rough Carpentry, Casework, Waterproofing, Insulation, Roofing, Sheet Metal, Doors / Frames/ Hardware, Overhead Coiling Doors, Storefront, Curtainwalls & Windows, Drywall & Stucco, Ceramic Tile, Ceilings, Flooring, Painting, Markerboards & Tackboards, Signage, Toilet Partitions & Bathroom Accessories, Operable Partitions, Lockers & Benches, Shelving, Projection Screens, Theatrical Rigging, Blinds, Fire Sprinkler, Plumbing, HVAC, Electrical, Low Voltage, Earthwork, Paving, Fence & Gates, Landscaping, Site Concrete, and Site Utilities.
SchoolDistrict · CA, US
Adjacent opportunities open for bidding right now.
Ventura County Office of Education
School DistrictCA
Posted
Oct 14, 2026
Nov 18, 2026
Work consists of school modernization project.
Lower Tule River Irrigation Dt
Special DistrictCA
Posted
Oct 28, 2026
Nov 28, 2026
Professional services for migrating Google Workspace to Microsoft 365, evaluating and deploying Microsoft Teams Phone, and assisting with OneDrive and SharePoint implementation.
School DistrictWA
Posted
Apr 28, 2026
Nov 10, 2026
Project includes a new front entry with a secure vestibule, ADA accessibility ramp / sidewalk, replacement of MEP equipment / fixtures, reconfiguration of the ADMIN. space, new finishes, new intercom system, and new fire alarm. The Project consists of the K- 8 school modernization construction of an approx. 18,935 SF multi story wood frame building with limited sitework including new septic system.
El Monte Union High School District
School DistrictCA
Posted
Oct 15, 2026
Jan 14, 2027
Work includes high school phase 2 modernization (new theatre & administration building) project.
Decision makers connected to this RFP from Los Angeles Unified School District.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
554 days before RFP
Facilities planned site due diligence and phased seismic modernization projects, including potential demolition and replacement of school buildings.
the first one, this is replacing modernizing buildings for seismic safety. That is the largest one. You're probably familiar with comprehensive modernizations and major modernizations where seismic upgrades was the driver for ending up at the campuses that we did. We're anticipating that we would be able to bring approximately 20 projects. We will have more…
Committee of the Whole
Board meeting · Apr 22, 2025
Board meeting
554 days before RFP
The voter-approved Measure US bond, with board-approved priorities, funded district facility modernization, site upgrades, accessibility work, and related capital improvements.
implementing the 9 billion measure US bond approved by our wonderful voters to modernize school facilities, expand green infrastructure, and prioritize investments in in the schools and communities that need them the most. Then we will turn our second presentation, supporting academic achievement through parent and family engagement, led by Dr. Francis…
Board meeting
524 days before RFP
The district recorded a plan to bid classroom upgrades, outdoor learning environment projects, and ADA barrier-removal projects within its 12-month forecast.
have a series of classroom replacement projects that we're going to be bidding, 20 classroom upgrade projects, which are 6 to 10 million each, 13 outdoor learning environment projects, and over a 100 million in ADA barrier removal projects. So, those are the projects that were in design that are going to be moving over to construction. In the chart that I…
Bond Oversight Committee
Board meeting · May 22, 2025
Board meeting
344 days before RFP
A proposed Board resolution would expand disaster preparedness, accelerate districtwide HVAC modernization, and create equitable cooling strategies across LAUSD campuses.
excited and proud to be bringing this critical resolution today. Um it is motivated in part by lived experience in being born and raised in the San Frernando Valley and seeing the impacts of uh living close to freeways, the impact of the pollution from that on our air quality um but also numerous days with tripledigit temperatures um and lacking air…
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (2 days left)
Committee of the Whole
Board meeting · Apr 22, 2025
Los Angeles Unified School District Board of Education Regular Board Meeting
Board meeting · Nov 18, 2025