Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Switchgear replacement. Remove the existing exterior medium-voltage switchgear and install a new code-compliant switchgear system. Work includes demolition and disposal of old equipment, construction of a new concrete pad, relocation of conflicting utilities, complete electrical and mechanical integration, and coordination with the utility provider. The contractor is responsible for rigging, wiring, terminations, fire/smoke barrier penetrations, and ensuring all work meets applicable NFPA and state codes. Final commissioning, functional testing, and delivery of updated documentation are required, with all activities scheduled to minimize disruption to campus operations.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Service 480V switchgear replacement.
Posted Date
Nov 6, 2025
Due Date
Feb 6, 2026
Release: Nov 6, 2025
Close: Feb 6, 2026
Service 480V switchgear replacement.
AvailableWork consists of replacement of 480v switchgear and subsystem, extension of distribution systems, reprograming of the SCADA and fire alarm systems as necessary.
Posted Date
Jan 7, 2026
Due Date
Feb 4, 2026
Release: Jan 7, 2026
Close: Feb 4, 2026
Work consists of replacement of 480v switchgear and subsystem, extension of distribution systems, reprograming of the SCADA and fire alarm systems as necessary.
AvailableProject scope involves removing the existing switchgear, supplying and installing a new switchgear system, and ensuring compatibility with existing transfer control equipment. This will improve reliability of the electrical infrastructure. Key requirements include compatibility with the upgraded echowater distributed control system (dcs) transfer controls and addressing issues related to maintaining power to critical equipment at the outfall.
Posted Date
Nov 10, 2025
Due Date
Feb 5, 2026
Release: Nov 10, 2025
Close: Feb 5, 2026
Project scope involves removing the existing switchgear, supplying and installing a new switchgear system, and ensuring compatibility with existing transfer control equipment. This will improve reliability of the electrical infrastructure. Key requirements include compatibility with the upgraded echowater distributed control system (dcs) transfer controls and addressing issues related to maintaining power to critical equipment at the outfall.
Western Riverside County Regional Wastewater Authority (WRCRWA) requires design services to replace its Medium Voltage Switchgear system, and is soliciting proposals through this RFP. The posting includes a pre-bid onsite meeting and an online Q&A process; proposals are to be submitted electronically. The procurement is being managed via the Western Municipal Water District’s PlanetBids portal and is estimated in an AI-generated range of $500,000–$2,000,000.
Posted Date
Jan 9, 2026
Due Date
Feb 4, 2026
Release: Jan 9, 2026
Close: Feb 4, 2026
Western Riverside County Regional Wastewater Authority (WRCRWA) requires design services to replace its Medium Voltage Switchgear system, and is soliciting proposals through this RFP. The posting includes a pre-bid onsite meeting and an online Q&A process; proposals are to be submitted electronically. The procurement is being managed via the Western Municipal Water District’s PlanetBids portal and is estimated in an AI-generated range of $500,000–$2,000,000.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis