Summary
The project consists of Abatement of hazardous materials per the enviroscience bid documents demolition of the entire 220/240 lane building, inclusive of foundation, ramps, steps, and concealed concrete or asphalt demolition of playground, inclusive of play structure footings and rubber surfacing demolition of 2 storage sheds in primary area of work and 1 storage shed in the field area demolition of all chain link fence and gates within the perimeter fence line demolition of all landscaping, including trees, and irrigation lines pull back power from 220/240 building to main electrical service cabinet on side of shop building and overhead periscope on east end of building pour level 3' concrete pad along building edge next to existing electrical service rough grade primary area of work and top with base rock to be level to surrounding existing asphalt provide and install 2 new light posts with additional 2" conduit for data by others home run to the maintenance shop provide new 2" conduit underground from maintenance shop to office trailer install electrified gate openers at perimeter gates (power/data).