Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes all labor, services, materials, equipment, and documentation necessary for the construction of the Well Project. This includes drilling, testing, equipping, and constructing a new 8” municipal well for the tribal water system. The project also includes a new 224 SF +/- CMU well equipment building, new electrical service, 353 LF of well transmission main, one service connection, one fire hydrant and chlorination facilities, as outlined in the Contract Documents, Plan Sheets and Summary of Work Bid Items. Additive/Alternative work for zonal sampling/testing of the well is also included in the scope of work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide well drilling services.
Posted Date
Dec 4, 2025
Due Date
Jan 5, 2026
Release: Dec 4, 2025
Close: Jan 5, 2026
Provide well drilling services.
AvailableConstruction of aquifer storage and recovery (ASR) well injection equipping improvements, including utility connections, piping, wellhead construction, chemical treatment systems, electrical/instrumentation, commissioning, and 12 months of post-completion well backflushing, testing, and water quality sampling.
Posted Date
-
Due Date
Jan 21, 2026
Close: Jan 21, 2026
Construction of aquifer storage and recovery (ASR) well injection equipping improvements, including utility connections, piping, wellhead construction, chemical treatment systems, electrical/instrumentation, commissioning, and 12 months of post-completion well backflushing, testing, and water quality sampling.
AvailableWork consists of well 21 construction and testing project. The work includes drilling an adjacent shallower well at an existing production well site, as well as performing an 8-hour step pump test and an 8-hour aquifer test.
Posted Date
Sep 22, 2025
Due Date
Jan 8, 2026
Release: Sep 22, 2025
Close: Jan 8, 2026
Work consists of well 21 construction and testing project. The work includes drilling an adjacent shallower well at an existing production well site, as well as performing an 8-hour step pump test and an 8-hour aquifer test.
AvailableThe Las Vegas Valley Water District issued an Invitation for Bid for the Well 124 Equipping project, covering civil, structural, mechanical, and electrical installations including site grading, new fencing, concrete curb and gutter, pump and equipment pads, pipelines, valves, and electrical/communication systems. The engineer's estimate is $1,516,900 and the place of performance is 1001 S. Valley View Blvd, Las Vegas, NV (Las Vegas Springs Preserve area). The solicitation was posted on 2025-12-18 and the bid deadline is 2026-01-13; attachments are listed but require login to view.
Posted Date
Dec 18, 2025
Due Date
Jan 13, 2026
Release: Dec 18, 2025
Close: Jan 13, 2026
The Las Vegas Valley Water District issued an Invitation for Bid for the Well 124 Equipping project, covering civil, structural, mechanical, and electrical installations including site grading, new fencing, concrete curb and gutter, pump and equipment pads, pipelines, valves, and electrical/communication systems. The engineer's estimate is $1,516,900 and the place of performance is 1001 S. Valley View Blvd, Las Vegas, NV (Las Vegas Springs Preserve area). The solicitation was posted on 2025-12-18 and the bid deadline is 2026-01-13; attachments are listed but require login to view.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →