Summary
Work consist of 13,695 lf of sediment barrier, 24 ea of inlet protection system, 3,173 sy of removal of existing concrete, 1,625. 7 cy of regular excavation, 1,575 sy of milling existing asphalt pavement, 144 tn of superpave asphaltic concrete, 14 tn of asphalt concrete friction course, 1 ea of manholes, 4 ea of manhole, adjust, utilities, 85 lf of pipe culvert, 48 lf of pipe culvert, 131 lf of pipe culvert, 327 lf of concrete curb & gutter, 45 lf of pipe handrail - guiderail, aluminum, 12,967 sy of concrete sidewalk and driveways, 4" thick 2,618 sy of concrete sidewalk and driveways. See attached file.