Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes replacement of a booster pump station and related appurtenances along with the demolition of an existing booster pump station.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Bid package #2 - waterproofing; bid package #3 - mechanical systems.
Posted Date
Dec 9, 2025
Due Date
Feb 10, 2026
Release: Dec 9, 2025
Close: Feb 10, 2026
Bid package #2 - waterproofing; bid package #3 - mechanical systems.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Demo and remove all existing restroom components to bare walls/ceiling before the commencement of new construction. Install all new plumbing and any new electrical wiring as necessary. Install new exhaust ventilation in both bathrooms, including controls, ductwork, and roof. Insulate the interior walls in both restrooms before the installation of new sheetrock. Install all new ada equipment: white handicapped toilet, white sink with lever-style hardware, a 36" grab bar, a 42" grab bar, mirror, towel dispenser, soap dispenser, and a toilet paper dispenser, insulate under-sink piping, a coat hook, an ada-compliant threshold, new door with lever-style hardware in all restrooms. See outside link.
Posted Date
Oct 17, 2025
Due Date
Feb 12, 2026
Release: Oct 17, 2025
Close: Feb 12, 2026
Demo and remove all existing restroom components to bare walls/ceiling before the commencement of new construction. Install all new plumbing and any new electrical wiring as necessary. Install new exhaust ventilation in both bathrooms, including controls, ductwork, and roof. Insulate the interior walls in both restrooms before the installation of new sheetrock. Install all new ada equipment: white handicapped toilet, white sink with lever-style hardware, a 36" grab bar, a 42" grab bar, mirror, towel dispenser, soap dispenser, and a toilet paper dispenser, insulate under-sink piping, a coat hook, an ada-compliant threshold, new door with lever-style hardware in all restrooms. See outside link.
AvailableWork includes removal and replacement of the roof system.
Posted Date
Nov 20, 2025
Due Date
Jan 23, 2026
Release: Nov 20, 2025
Close: Jan 23, 2026
Work includes removal and replacement of the roof system.
Air Cooled Chiller Replacement/Installation.
Posted Date
Jan 15, 2026
Due Date
Jan 26, 2026
Release: Jan 15, 2026
Close: Jan 26, 2026
Air Cooled Chiller Replacement/Installation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →