Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide substation electrical equipment painting as needed and in a timely manner.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
Posted Date
Nov 22, 2025
Due Date
Jan 8, 2026
Release: Nov 22, 2025
Close: Jan 8, 2026
Work includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
Premium
Access the largest public sector contact database
Merrill Road Substation T1 Replacement and Two Feeder Additions (RFP).
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Merrill Road Substation T1 Replacement and Two Feeder Additions (RFP).
AvailableProvide fuseless shunt capacitor bank for substation project.
Posted Date
Dec 8, 2025
Due Date
Jan 16, 2026
Release: Dec 8, 2025
Close: Jan 16, 2026
Provide fuseless shunt capacitor bank for substation project.
AvailableProvide construction services for JEAs Miller Solar Substation project. The work consists of installing a new 230kV, 3-element ring bus. A prefabricated control enclosure, which will contain preassembled relay panels, and will be installed at site by a third-party vendor described herein (the "Work"). Mobilization, Site Surveying and establish baselines Site Preparation Receive and offload substation packager materials, Install foundations for all structures and equipment, Install ground grid, ground rods, and equipment ground tails, Install conduits/cable trenches, Backfill and compact site as necessary, Install substation rock, Install site access roads, Install security fencing and gates, Transport JEA provided materials and equipment from JEA storeroom, Install 230kV structures, bus, and equipment, Install grounds to structures and equipment, Finish conduit installation, pull cables, and terminate at yard equipment and inside the control house relay equipment Site Clean-up, sodding/seeding and disposal of debris.
Posted Date
Nov 6, 2025
Due Date
Dec 16, 2025
Release: Nov 6, 2025
Close: Dec 16, 2025
Provide construction services for JEAs Miller Solar Substation project. The work consists of installing a new 230kV, 3-element ring bus. A prefabricated control enclosure, which will contain preassembled relay panels, and will be installed at site by a third-party vendor described herein (the "Work"). Mobilization, Site Surveying and establish baselines Site Preparation Receive and offload substation packager materials, Install foundations for all structures and equipment, Install ground grid, ground rods, and equipment ground tails, Install conduits/cable trenches, Backfill and compact site as necessary, Install substation rock, Install site access roads, Install security fencing and gates, Transport JEA provided materials and equipment from JEA storeroom, Install 230kV structures, bus, and equipment, Install grounds to structures and equipment, Finish conduit installation, pull cables, and terminate at yard equipment and inside the control house relay equipment Site Clean-up, sodding/seeding and disposal of debris.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis