Retrieving RFP details
Release
Close
JEA
Provide construction services for JEAs Miller Solar Substation project. The work consists of installing a new 230kV, 3-element ring bus. A prefabricated control enclosure, which will contain preassembled relay panels, and will be installed at site by a third-party vendor described herein (the "Work"). Mobilization, Site Surveying and establish baselines Site Preparation Receive and offload substation packager materials, Install foundations for all structures and equipment, Install ground grid, ground rods, and equipment ground tails, Install conduits/cable trenches, Backfill and compact site as necessary, Install substation rock, Install site access roads, Install security fencing and gates, Transport JEA provided materials and equipment from JEA storeroom, Install 230kV structures, bus, and equipment, Install grounds to structures and equipment, Finish conduit installation, pull cables, and terminate at yard equipment and inside the control house relay equipment Site Clean-up, sodding/seeding and disposal of debris.
1412069851
zip
Oklahoma Grand River Dam Authority
Supply of materials for power line and substation construction - as needed.
City of East Providence
Construction of the pierce field police substation. See outside link.
Navajo Tribal Utility Authority (NTUA)
Seeking qualified engineering firms for kayenta 230kv transformer no. 2 replacement.
Release
Nov 06, 2025
Close
Dec 09, 2025