Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide fuseless shunt capacitor bank for substation project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Merrill Road Substation T1 Replacement and Two Feeder Additions (RFP).
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Merrill Road Substation T1 Replacement and Two Feeder Additions (RFP).
AvailablePremium
Access the largest public sector contact database
Netarts Getaway for the Oceanside Substation Project. Contractor shall install sixteen (16) E20 vaults, three (3) runs of 3" Schedule 40 PVC with mule tape, warning tape, and warning signs PVC must be solid gray. Depth of PVC shall be a minimum of 48" deep from existing grade to the top of pipe. Contractor bid to include the supply of all vaults, PVC, mule tape, and warning signs.Contractor shall trench and install. Contractor shall clean the installed PVC runs after installation and run an appropriately sized wire brush and flexible mandrel through the PVC prior to installing mule tape. Contractor shall remove and dispose of any excavated material, bore material, and/or garbage from the jobsite and private property upon completion of each day's work.
Posted Date
Nov 13, 2025
Due Date
Jan 28, 2026
Release: Nov 13, 2025
Close: Jan 28, 2026
Netarts Getaway for the Oceanside Substation Project. Contractor shall install sixteen (16) E20 vaults, three (3) runs of 3" Schedule 40 PVC with mule tape, warning tape, and warning signs PVC must be solid gray. Depth of PVC shall be a minimum of 48" deep from existing grade to the top of pipe. Contractor bid to include the supply of all vaults, PVC, mule tape, and warning signs.Contractor shall trench and install. Contractor shall clean the installed PVC runs after installation and run an appropriately sized wire brush and flexible mandrel through the PVC prior to installing mule tape. Contractor shall remove and dispose of any excavated material, bore material, and/or garbage from the jobsite and private property upon completion of each day's work.
AvailableThis Contract is for the replacement of 26 existing prefabricated traction power substations. The replacement work includes removal of the existing prefabricated type substation enclosures, and design, fabrication, factory testing, delivery, installation, field testing acceptance testing and commissioning for new 2 MW prefabricated-type traction power substations. The work also includes the addition of 750 Vdc pad-mounted load-break disconnect switches and modifications to existing 750 Vdc duct bank and cable systems to interface the new substations and load-break switches with the existing 750 Vdc power distribution systems at all 28 prefabricated Substation locations.
Posted Date
Mar 31, 2025
Due Date
Dec 16, 2025
Release: Mar 31, 2025
Close: Dec 16, 2025
This Contract is for the replacement of 26 existing prefabricated traction power substations. The replacement work includes removal of the existing prefabricated type substation enclosures, and design, fabrication, factory testing, delivery, installation, field testing acceptance testing and commissioning for new 2 MW prefabricated-type traction power substations. The work also includes the addition of 750 Vdc pad-mounted load-break disconnect switches and modifications to existing 750 Vdc duct bank and cable systems to interface the new substations and load-break switches with the existing 750 Vdc power distribution systems at all 28 prefabricated Substation locations.
AvailableProvide construction services for JEAs Miller Solar Substation project. The work consists of installing a new 230kV, 3-element ring bus. A prefabricated control enclosure, which will contain preassembled relay panels, and will be installed at site by a third-party vendor described herein (the "Work"). Mobilization, Site Surveying and establish baselines Site Preparation Receive and offload substation packager materials, Install foundations for all structures and equipment, Install ground grid, ground rods, and equipment ground tails, Install conduits/cable trenches, Backfill and compact site as necessary, Install substation rock, Install site access roads, Install security fencing and gates, Transport JEA provided materials and equipment from JEA storeroom, Install 230kV structures, bus, and equipment, Install grounds to structures and equipment, Finish conduit installation, pull cables, and terminate at yard equipment and inside the control house relay equipment Site Clean-up, sodding/seeding and disposal of debris.
Posted Date
Nov 6, 2025
Due Date
Dec 16, 2025
Release: Nov 6, 2025
Close: Dec 16, 2025
Provide construction services for JEAs Miller Solar Substation project. The work consists of installing a new 230kV, 3-element ring bus. A prefabricated control enclosure, which will contain preassembled relay panels, and will be installed at site by a third-party vendor described herein (the "Work"). Mobilization, Site Surveying and establish baselines Site Preparation Receive and offload substation packager materials, Install foundations for all structures and equipment, Install ground grid, ground rods, and equipment ground tails, Install conduits/cable trenches, Backfill and compact site as necessary, Install substation rock, Install site access roads, Install security fencing and gates, Transport JEA provided materials and equipment from JEA storeroom, Install 230kV structures, bus, and equipment, Install grounds to structures and equipment, Finish conduit installation, pull cables, and terminate at yard equipment and inside the control house relay equipment Site Clean-up, sodding/seeding and disposal of debris.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis