Summary
Work includes Preparation of existing T1-11 wood siding, including removal and replacement of any sections exhibiting damage, sponginess, rot or failing to meet ANSI certified standards/county building codes as a suitable substrate for stucco. Apply new lath and three coat stucco with a hard trowel smooth acrylic color integrated finish on the living quarters of the existing fire station. Contractor to supply all scaffolding and equipment necessary for work. Fascia and eave overhangs to remain wood finish. Window, door, soffit/fascia and drip edge terminations to be determined by contractor utilizing appropriate accessory metal (z-bar, j-metal, L-bar, etc.) and appropriate expansion joints installed where appropriate and, in a manner, creating a symmetric and balanced aesthetic.