Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes traffic control, removal of existing bridges, construction of a Twin 12' x 6' x 44' Reinforced Concrete Box Culvert, construction of a Twin 12' x 5' x 45' Reinforced Concrete Box Culvert, and associated work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Structure removals, structure replacement, and incidentals, 0.074, Miles, work includes: 1,280 LF, Fiber rolls 12in. 328 TN, Aggregate surface course cl 13. 508 SY, Geosynthetic material type g. 233 SY, Geosynthetic material type rr. 175 Acre, Wetland mitigation site 1.
Posted Date
Nov 17, 2025
Due Date
Dec 12, 2025
Release: Nov 17, 2025
Close: Dec 12, 2025
Structure removals, structure replacement, and incidentals, 0.074, Miles, work includes: 1,280 LF, Fiber rolls 12in. 328 TN, Aggregate surface course cl 13. 508 SY, Geosynthetic material type g. 233 SY, Geosynthetic material type rr. 175 Acre, Wetland mitigation site 1.
Premium
Access the largest public sector contact database
Bridge structure replacement. Precast box culvert span(s): 1 structure steel.
Posted Date
Nov 14, 2025
Due Date
Jan 13, 2026
Release: Nov 14, 2025
Close: Jan 13, 2026
Bridge structure replacement. Precast box culvert span(s): 1 structure steel.
AvailableWork includes removals, grading, aggregate, asphalt pavement, structure replacement, culvert pipe, curb and gutter, beam guard, erosion control, permanent signing, traffic control, pavement marking, restoration.
Posted Date
Nov 4, 2025
Due Date
Jan 13, 2026
Release: Nov 4, 2025
Close: Jan 13, 2026
Work includes removals, grading, aggregate, asphalt pavement, structure replacement, culvert pipe, curb and gutter, beam guard, erosion control, permanent signing, traffic control, pavement marking, restoration.
AvailableSeeking the services of a qualified contractor to replace, in kind, gates at water control structure s-405a. Minimal repairs will be performed on the concrete portions of this water control structure to create a watertight seal.
Posted Date
Nov 25, 2025
Due Date
Jan 9, 2026
Release: Nov 25, 2025
Close: Jan 9, 2026
Seeking the services of a qualified contractor to replace, in kind, gates at water control structure s-405a. Minimal repairs will be performed on the concrete portions of this water control structure to create a watertight seal.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis