Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of approx 2,350 LF of assorted 15"-30" storm drain piping, 2,750 LF of 24" roll-over curb and gutter, various curb inlets and drop inlets and associated 9.5 mm superpave asphalt resurfacing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
CDBG chemung street paving and drainage.
Posted Date
Dec 3, 2025
Due Date
Dec 19, 2025
Release: Dec 3, 2025
Close: Dec 19, 2025
CDBG chemung street paving and drainage.
AvailablePremium
Access the largest public sector contact database
Project consists of main line and lateral storm sewers along Wiltshire Drive, Lincolnshire Drive, and Londonderry Lane that connect to a proposed pump station that discharges into the Des Plaines. The size of the proposed storm sewer ranges from 12" to 60". Key scope of work items includes removal, abandonment and installation of 12" water main via open cut and trenchless methods, relo- cation of a segment of the Lincolnshire Drive sanitary sewer to accommodate the proposed drainage improvements, pavement patching and full pavement reconstruction, construction of a pump station, relocation of an existing pedestrian path and compen satorystor age grading.
Posted Date
Nov 18, 2025
Due Date
Dec 17, 2025
Release: Nov 18, 2025
Close: Dec 17, 2025
Project consists of main line and lateral storm sewers along Wiltshire Drive, Lincolnshire Drive, and Londonderry Lane that connect to a proposed pump station that discharges into the Des Plaines. The size of the proposed storm sewer ranges from 12" to 60". Key scope of work items includes removal, abandonment and installation of 12" water main via open cut and trenchless methods, relo- cation of a segment of the Lincolnshire Drive sanitary sewer to accommodate the proposed drainage improvements, pavement patching and full pavement reconstruction, construction of a pump station, relocation of an existing pedestrian path and compen satorystor age grading.
AvailableThe reconstruction consist of approx 378 LF of Canterbury Drive at its intersection with U.S. Highway 71 and the replacement of an existing storm drain system 580 FT in length along Canterbury Drive from Rudy Road to Kingswood Drive. The items of work include 90 TONS of asphalt concrete overlay; 172 SY of 7" concrete paving; 186 LF of 24"x38" reinforced concrete elliptical storm drain; 423 LF of 3'-6" wide by 1'-6" deep concrete vertical wall channel; 222 LF of 14"x23" reinforced concrete elliptical storm drain, drainage inlets and headwalls, concrete driveway replacement, ditch regrading and other related items.
Posted Date
Nov 22, 2025
Due Date
Dec 17, 2025
Release: Nov 22, 2025
Close: Dec 17, 2025
The reconstruction consist of approx 378 LF of Canterbury Drive at its intersection with U.S. Highway 71 and the replacement of an existing storm drain system 580 FT in length along Canterbury Drive from Rudy Road to Kingswood Drive. The items of work include 90 TONS of asphalt concrete overlay; 172 SY of 7" concrete paving; 186 LF of 24"x38" reinforced concrete elliptical storm drain; 423 LF of 3'-6" wide by 1'-6" deep concrete vertical wall channel; 222 LF of 14"x23" reinforced concrete elliptical storm drain, drainage inlets and headwalls, concrete driveway replacement, ditch regrading and other related items.
AvailableProcurement for the installation of a new, fully operational traffic signal system at the intersection of Riverside Drive and Barrett Street.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
Procurement for the installation of a new, fully operational traffic signal system at the intersection of Riverside Drive and Barrett Street.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis