Summary
Consist of the following for “Schedule A”, “Schedule B”, and “Schedule C” as necessary: excavate, shore, and dewater as necessary to expose the existing stormwater pump station discharge pipelines and to perform work on these pipes. Furnish and install, flanged tees, welded pipe spools, and tapping sleeves on existing stormwater pump station piping per manufacturer recommendations. Furnish and install, riser pipes, backing rings, and blind flanges from the existing discharge pipe to an access cover. Schedule A: the contracting agency is consolidated diking improvement District No. 3. Work under this contract will be for pipe inspection ports to be added to discharge piping for 1) Tam-1 Pump Station, 2) Tam-2 Pump Station, 3) Coweeman Pump Station, 4) Baker Way Pump Station and 5) Elks Pump Station. Schedule B: the contracting agency is drainage improvement District No. 1. Work under this contract will be for pipe inspection ports to be added to discharge piping for 1) Redpath Pump Station and 2) North Kelso (King Creek) Pump Station. Schedule C: the contracting agency is the Lexington flood control Zone District. Work under this contract will be for pipe inspection ports to be added to discharge piping for 1) McCorkle Creek Pump Stations 1 & 2, 2) Ventura Drive Pump Station, 3) Beacon Hill Pump Station, 4) Pankratz Pump Station, and 5) BPA Pump Station.