Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes storm drainage replacement and waterline relocation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project includes replacement of approx. 850' of storm drains, relining approx. 260' of storm drain; and construction of an earth dam for a detention basin.
Posted Date
Nov 20, 2025
Due Date
Dec 16, 2025
Release: Nov 20, 2025
Close: Dec 16, 2025
Project includes replacement of approx. 850' of storm drains, relining approx. 260' of storm drain; and construction of an earth dam for a detention basin.
AvailablePremium
Access the largest public sector contact database
The Maryland Port Administration seeks a qualified contractor to perform storm drain improvements at the Fairfield Marine Terminal, including installation of approximately 1,600 linear feet of storm drain, disturbance of roughly 12.23 acres, and installation of a downstream bypass pipe to mitigate flooding. The project requires an experienced civil construction contractor meeting specified minimum experience and reference requirements and providing designated key staff such as a project manager, construction superintendent, and health and safety officer.
Posted Date
Oct 14, 2025
Due Date
Dec 16, 2025
Release: Oct 14, 2025
Close: Dec 16, 2025
The Maryland Port Administration seeks a qualified contractor to perform storm drain improvements at the Fairfield Marine Terminal, including installation of approximately 1,600 linear feet of storm drain, disturbance of roughly 12.23 acres, and installation of a downstream bypass pipe to mitigate flooding. The project requires an experienced civil construction contractor meeting specified minimum experience and reference requirements and providing designated key staff such as a project manager, construction superintendent, and health and safety officer.
AvailableProject consists of the construction of 885 LF of rccp storm drain pipe, inlets, manholes, and related work.
Posted Date
Dec 2, 2025
Due Date
Jan 12, 2026
Release: Dec 2, 2025
Close: Jan 12, 2026
Project consists of the construction of 885 LF of rccp storm drain pipe, inlets, manholes, and related work.
AvailableWork consists of, in general, the construction of a new storm drain channel, including grading, backfilling, compaction, paving, and concrete work. The concrete work includes the construction of new cross gutters, ramps, spandrels, sidewalk, and curb and gutter. The scope of work also includes the removal of existing trees and the removal and replacement of a guardrail.
Posted Date
Nov 10, 2025
Due Date
Dec 16, 2025
Release: Nov 10, 2025
Close: Dec 16, 2025
Work consists of, in general, the construction of a new storm drain channel, including grading, backfilling, compaction, paving, and concrete work. The concrete work includes the construction of new cross gutters, ramps, spandrels, sidewalk, and curb and gutter. The scope of work also includes the removal of existing trees and the removal and replacement of a guardrail.