Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
City of Markham issued RFP 269-R-25 for Storm and Sanitary Sewer CCTV Inspection services covering 2026–2029 to inspect water and sewer infrastructure. The solicitation is listed as Open with a published date of 2025-11-19 and a closing date of 2025-12-12, and requires online submissions through the portal. Bid documents are available on the Bids & Tenders site but may be secured and require registration and payment to download.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Proposed improvement consists of the cleaning and closed-circuit television inspection of approx. 44,967 LF of various size sanitary main and 17,863 LF of various size storm sewers.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Close: Dec 16, 2025
Proposed improvement consists of the cleaning and closed-circuit television inspection of approx. 44,967 LF of various size sanitary main and 17,863 LF of various size storm sewers.
AvailablePremium
Access the largest public sector contact database
Work includes 12,614 LF sewer main cleaning light; 4,000 LF sewer main cleaning heavy; 12 EA lateral/tap cutting; 12,614 LF closed circuit television (cctv) inspection; bypass pumping for 8" - 12" main as specified; bypass pumping for 15" - 36" main as specified.
Posted Date
Nov 19, 2025
Due Date
Dec 16, 2025
Release: Nov 19, 2025
Close: Dec 16, 2025
Work includes 12,614 LF sewer main cleaning light; 4,000 LF sewer main cleaning heavy; 12 EA lateral/tap cutting; 12,614 LF closed circuit television (cctv) inspection; bypass pumping for 8" - 12" main as specified; bypass pumping for 15" - 36" main as specified.
AvailableWork includes 12,614 LF sewer main cleaning light; 4,000 LF sewer main cleaning heavy; 12 EA lateral/tap cutting; 12,614 LF closed circuit television (cctv) inspection; bypass pumping for 8" - 12" main as specified; bypass pumping for 15" - 36" main as specified.
Posted Date
Nov 19, 2025
Due Date
Dec 16, 2025
Release: Nov 19, 2025
Close: Dec 16, 2025
Work includes 12,614 LF sewer main cleaning light; 4,000 LF sewer main cleaning heavy; 12 EA lateral/tap cutting; 12,614 LF closed circuit television (cctv) inspection; bypass pumping for 8" - 12" main as specified; bypass pumping for 15" - 36" main as specified.
AvailableWork includes approx. 7,394 LF of 8" Preparatory Sewer Cleaning and Pre-Lining Televising; 230 LF of 10" Preparatory Sewer Cleaning and Pre-Lining Televising; 2 EA of Sanitary Sewer Manhole Grouting; 2 EA of Sanitary Sewer Manhole Lining; 4 EA of Sanitary Lateral Grouting; 5 EA of Repair Protruding Tap Without Excavation. See outside link.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Work includes approx. 7,394 LF of 8" Preparatory Sewer Cleaning and Pre-Lining Televising; 230 LF of 10" Preparatory Sewer Cleaning and Pre-Lining Televising; 2 EA of Sanitary Sewer Manhole Grouting; 2 EA of Sanitary Sewer Manhole Lining; 4 EA of Sanitary Lateral Grouting; 5 EA of Repair Protruding Tap Without Excavation. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis