Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide construction inspection/material testing. The consultant will provide professional, technical, and other personnel, equipment, material, and all other things necessary for field inspection for a bridge deck replacement and a total bridge replacement. See attached bid file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide construction inspection/material testing. The consultant will provide professional, technical, and other personnel, equipment, material, and all other things necessary for field inspection for the bridge replacements. See attached bid file.
Posted Date
Dec 23, 2025
Due Date
Jan 15, 2026
Release: Dec 23, 2025
Close: Jan 15, 2026
Provide construction inspection/material testing. The consultant will provide professional, technical, and other personnel, equipment, material, and all other things necessary for field inspection for the bridge replacements. See attached bid file.
AvailableProvide construction inspection/material testing. The consultant will provide professional, technical, and other personnel, equipment, material, and all other things necessary for field inspection for the bridge replacement. The consultant shall provide quality assurance (QA) inspection oversight for roadway construction. Additional services to be provided by the consultant include field inspections of all work and contract activities, on-site material QA testing, project documentation, traffic control oversite, measurement and payment of work performed, and preparation of other reports and documentation as required by MoDOT such as but not limited to daily work reports, material reporting, pay quantities, CUF reviews, wage rate interviews, bulletin board inspections, estimates generation, change orders generation, and as-builts final plans, and contractor performance ratings.
Posted Date
Dec 23, 2025
Due Date
Jan 15, 2026
Release: Dec 23, 2025
Close: Jan 15, 2026
Provide construction inspection/material testing. The consultant will provide professional, technical, and other personnel, equipment, material, and all other things necessary for field inspection for the bridge replacement. The consultant shall provide quality assurance (QA) inspection oversight for roadway construction. Additional services to be provided by the consultant include field inspections of all work and contract activities, on-site material QA testing, project documentation, traffic control oversite, measurement and payment of work performed, and preparation of other reports and documentation as required by MoDOT such as but not limited to daily work reports, material reporting, pay quantities, CUF reviews, wage rate interviews, bulletin board inspections, estimates generation, change orders generation, and as-builts final plans, and contractor performance ratings.
AvailableReplacement of Bridge
Posted Date
-
Due Date
Feb 2, 2026
Release: -
Close: Feb 2, 2026
Replacement of Bridge
AvailableDESIGN-BUILD services for Bridge Group 16D Route 6 Johnston. The proposals would include completely replacing three (3) bridges (Bridge Nos. 060701, 060801, and 060901) along the US Route 6 corridor; realigning the US Route 6 westbound off-ramp to US Route 6A westbound to improve intersection geometry and safety.
Posted Date
Nov 26, 2025
Due Date
Mar 9, 2026
Release: Nov 26, 2025
Close: Mar 9, 2026
DESIGN-BUILD services for Bridge Group 16D Route 6 Johnston. The proposals would include completely replacing three (3) bridges (Bridge Nos. 060701, 060801, and 060901) along the US Route 6 corridor; realigning the US Route 6 westbound off-ramp to US Route 6A westbound to improve intersection geometry and safety.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis