CountyCA
Posted
Aug 13, 2026
Oct 1, 2026
Black Rascal Creek Flood Control Project Construction Services
Excavation Support. Lump sum includes full compensation for all Work to plan, design, furnish, install, and remove temporary sheeting, shoring, bracing and equivalent methods as required; Preparation of the Stormwater Pollution Prevention Plan (SWPPP).
