Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove an existing bridge and install a 6'-6" tall, 24-foot long out-to-out clear span prestressed concrete box beam bridge, 24' wide, with a 5-inch top concrete slab and guardrail.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Bridge approach construction & bridge installation on corridor. Project also consists of installation of two pre-purchased, pre-fab modular new bridges (one 70’x14’ and another 50’x14’) into these same locations. Contractor will be required to coordinate with bridge fabricator (ADM Welding & Fabrication) to deliver bridges to site when contractor is ready to set bridges in place.
Posted Date
Jan 13, 2026
Due Date
Mar 5, 2026
Release: Jan 13, 2026
Close: Mar 5, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bridge approach construction & bridge installation on corridor. Project also consists of installation of two pre-purchased, pre-fab modular new bridges (one 70’x14’ and another 50’x14’) into these same locations. Contractor will be required to coordinate with bridge fabricator (ADM Welding & Fabrication) to deliver bridges to site when contractor is ready to set bridges in place.
AvailableRemoval and replacement of bridge rail bridge rail end blocks, grading, removal of asphalt mat from bridge, repairs of concrete bridge deck and structures, waterproofing of bridge deck, asphalt patching, asphalt milling, overlay paving, installation of concrete curb, sidewalk, curb ramps and chase drain.
Posted Date
Dec 17, 2025
Due Date
Feb 26, 2026
Release: Dec 17, 2025
Close: Feb 26, 2026
Removal and replacement of bridge rail bridge rail end blocks, grading, removal of asphalt mat from bridge, repairs of concrete bridge deck and structures, waterproofing of bridge deck, asphalt patching, asphalt milling, overlay paving, installation of concrete curb, sidewalk, curb ramps and chase drain.
AvailableReceiving delivery and transport of bridge assembly to project site. Remove existing bridge and install new bridge assembly.
Posted Date
Jan 26, 2026
Due Date
Feb 16, 2026
Release: Jan 26, 2026
Close: Feb 16, 2026
Receiving delivery and transport of bridge assembly to project site. Remove existing bridge and install new bridge assembly.
AvailableSeeking bids for the removal of the existing bridge pavement and approach pavement, cleanup of an emulsified asphalt that is accessible from the top of the bridge deck, and installation of new pavement, a waterproofing membrane, and approach paving. The bridge railing will need to be removed as part of the work and the Town is using the opportunity to repair the existing bridge rail and approach guardrail by replacing deteriorated rail elements.
Posted Date
Jan 12, 2026
Due Date
Feb 11, 2026
Release: Jan 12, 2026
Close: Feb 11, 2026
Seeking bids for the removal of the existing bridge pavement and approach pavement, cleanup of an emulsified asphalt that is accessible from the top of the bridge deck, and installation of new pavement, a waterproofing membrane, and approach paving. The bridge railing will need to be removed as part of the work and the Town is using the opportunity to repair the existing bridge rail and approach guardrail by replacing deteriorated rail elements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →