Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Vernon Public Utilities Department is soliciting competitive bids to replace two rooftop package HVAC units and upgrade ductwork in the Station A control room. The project includes the installation of Trane package units, economizers, particulate air cleaners, and UV lamps to improve system efficiency and air quality. Bidders must meet prevailing-wage public contract experience requirements for this project, which has an estimated value between $70,000 and $90,000.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes HVAC replacement.
Posted Date
Jan 18, 2026
Due Date
Feb 23, 2026
Release: Jan 18, 2026
Close: Feb 23, 2026
Work includes HVAC replacement.
AvailableConstruct HVAC system replacements and improvements at Fernan Stem Academy, Hayden Meadows Elementary, Coeur d'Alene High School, Lakes Middle School, and the District Office.
Posted Date
Jan 16, 2026
Due Date
Feb 3, 2026
Release: Jan 16, 2026
Close: Feb 3, 2026
Construct HVAC system replacements and improvements at Fernan Stem Academy, Hayden Meadows Elementary, Coeur d'Alene High School, Lakes Middle School, and the District Office.
AvailableAll work associated with the Control Room Upgrades minus HVAC and Electrical work, All work associated with the Control Room Upgrades Electrical work, All work associated with the Control Room Upgrades HVAC work, Lump Sum of all work associated with the Control Room Upgrades.
Posted Date
Oct 3, 2025
Due Date
Feb 3, 2026
Release: Oct 3, 2025
Close: Feb 3, 2026
All work associated with the Control Room Upgrades minus HVAC and Electrical work, All work associated with the Control Room Upgrades Electrical work, All work associated with the Control Room Upgrades HVAC work, Lump Sum of all work associated with the Control Room Upgrades.
AvailableRemove the existing HVAC system and install a new, high-efficiency system while maintaining continuous station operations.The HVAC scope covers procurement and installation of packaged heat pump units of various capacities, split systems, ductwork, insulation, refrigerant piping, dampers, silencers, sensors, and a new controls system with head-end equipment and CO₂ sensors. Electrical work includes safe-off of existing systems, installation of a new 400A panel and feeder, and all necessary connections, disconnects, and feeders for HVAC equipment, along with seismic bracing, firestopping, and temporary power.
Posted Date
Jan 10, 2026
Due Date
Feb 10, 2026
Release: Jan 10, 2026
Close: Feb 10, 2026
Remove the existing HVAC system and install a new, high-efficiency system while maintaining continuous station operations.The HVAC scope covers procurement and installation of packaged heat pump units of various capacities, split systems, ductwork, insulation, refrigerant piping, dampers, silencers, sensors, and a new controls system with head-end equipment and CO₂ sensors. Electrical work includes safe-off of existing systems, installation of a new 400A panel and feeder, and all necessary connections, disconnects, and feeders for HVAC equipment, along with seismic bracing, firestopping, and temporary power.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis