Summary
Work consists of phased additions and renovations to the existing fire station 201 (a 3-bay, back-in station w/ fire headquarters). The existing station is approx 13,826 SF with new additions totaling approximately 7,122 sf (one additional apparatus bay, new administration space and expanded living space). The drawings indicate which portions of the existing space get renovated and/or have interior finish upgrades, including which portions of this scope are alternates. The site does not currently have access to sanitary sewer; however, a new connection will be made to sanitary sewer to the north, allowing us to demolish the existing septic system. See attached file.