Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes demolition of existing metal cornice, approx, 200 LF, and associated wood framing completely. Repoint existing mortar joints as required and seal any openings that have been exposed. Furnish and install fiberglass cornice and associated framing as required and shown on drawings. Remove existing metal siding from elevator penthouse, and patch and repair existing sheathing as required. Furnish and install metal wall panels as specified.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Town of Orange Park is soliciting bids via an Invitation to Bid (ITB-PW-01-0-2026/CR) for the rehabilitation and historical preservation of Clarke Park Cottage. The solicitation was posted 2026-01-14 and closes 2026-02-13 at 10:00 AM ET, with a mandatory pre-bid meeting scheduled for 2026-01-28 at 9:00 AM at the project site. The procurement contact is Courtney Russo (crusso@townop.com, (904) 278-3011); this is a construction ITB (not a grant) and the posting includes downloadable bid documents (Invitation to Bid, plans, and addendum) on the buyer-managed page.
Posted Date
Jan 14, 2026
Due Date
Feb 13, 2026
Release: Jan 14, 2026
Close: Feb 13, 2026
The Town of Orange Park is soliciting bids via an Invitation to Bid (ITB-PW-01-0-2026/CR) for the rehabilitation and historical preservation of Clarke Park Cottage. The solicitation was posted 2026-01-14 and closes 2026-02-13 at 10:00 AM ET, with a mandatory pre-bid meeting scheduled for 2026-01-28 at 9:00 AM at the project site. The procurement contact is Courtney Russo (crusso@townop.com, (904) 278-3011); this is a construction ITB (not a grant) and the posting includes downloadable bid documents (Invitation to Bid, plans, and addendum) on the buyer-managed page.
AvailableLift station rehabilitation work includes construct a 20' x 14' pre-fabricated concrete control building; furnish and install new electrical and controls; install a new 8' chain link fence; remove and replace the existing submersible pumps; see outside link.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Lift station rehabilitation work includes construct a 20' x 14' pre-fabricated concrete control building; furnish and install new electrical and controls; install a new 8' chain link fence; remove and replace the existing submersible pumps; see outside link.
AvailableThis RFP is for the rehabilitation of the Wall & Avenue C Lift Station, including civil, electrical, mechanical, and site improvements.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
This RFP is for the rehabilitation of the Wall & Avenue C Lift Station, including civil, electrical, mechanical, and site improvements.
AvailableWork includes 1 LS ninth street ps force main interconnection; 1 LS cured in place pipe lining 8" (heat cured); 1 LS cured in place pipe lining 10" (heat cured); 430 LF heavy cleaning; 10 EA protruding tap removal; 1 EA point repair 8" dip, 20' length, 0'-8' depth; 1 ea point repair 8" dip, 20' length, 8'-12' depth; 6 EA point repair 8" pvc c900, 20' length, 0'- 8' depth; 16 EA cut in wye service lateral by point repair - 8"; 1 EA cut in wye service lateral by point repair - 10"; 10 EA cipp service lateral seal 4", 70' max; 20 EA cut-in service lateral cleanout (4"); 8 EA manhole ring and cover replacement with standard ring and cover. See attached file.
Posted Date
Oct 13, 2025
Due Date
Feb 4, 2026
Release: Oct 13, 2025
Close: Feb 4, 2026
Work includes 1 LS ninth street ps force main interconnection; 1 LS cured in place pipe lining 8" (heat cured); 1 LS cured in place pipe lining 10" (heat cured); 430 LF heavy cleaning; 10 EA protruding tap removal; 1 EA point repair 8" dip, 20' length, 0'-8' depth; 1 ea point repair 8" dip, 20' length, 8'-12' depth; 6 EA point repair 8" pvc c900, 20' length, 0'- 8' depth; 16 EA cut in wye service lateral by point repair - 8"; 1 EA cut in wye service lateral by point repair - 10"; 10 EA cipp service lateral seal 4", 70' max; 20 EA cut-in service lateral cleanout (4"); 8 EA manhole ring and cover replacement with standard ring and cover. See attached file.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis