Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS ninth street ps force main interconnection; 1 LS cured in place pipe lining 8" (heat cured); 1 LS cured in place pipe lining 10" (heat cured); 430 LF heavy cleaning; 10 EA protruding tap removal; 1 EA point repair 8" dip, 20' length, 0'-8' depth; 1 ea point repair 8" dip, 20' length, 8'-12' depth; 6 EA point repair 8" pvc c900, 20' length, 0'- 8' depth; 16 EA cut in wye service lateral by point repair - 8"; 1 EA cut in wye service lateral by point repair - 10"; 10 EA cipp service lateral seal 4", 70' max; 20 EA cut-in service lateral cleanout (4"); 8 EA manhole ring and cover replacement with standard ring and cover. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This Invitation to Bid is for the rehabilitation of existing sewer infrastructure and the construction of approximately 9,000 linear feet of 8-inch sanitary sewer force main in Southport, NC.
Posted Date
Jan 14, 2026
Due Date
Feb 4, 2026
Release: Jan 14, 2026
Close: Feb 4, 2026
This Invitation to Bid is for the rehabilitation of existing sewer infrastructure and the construction of approximately 9,000 linear feet of 8-inch sanitary sewer force main in Southport, NC.
AvailableWork include lining of approx 1,240 LF of 12" wastewater main, lining of 5 manholes, the full replacement of 1 manhole, and all related appurtenances and restoration.
Posted Date
Jan 7, 2026
Due Date
Feb 4, 2026
Release: Jan 7, 2026
Close: Feb 4, 2026
Work include lining of approx 1,240 LF of 12" wastewater main, lining of 5 manholes, the full replacement of 1 manhole, and all related appurtenances and restoration.
AvailableRelease: Dec 8, 2025
Close: Feb 9, 2026
Wastewater rehabilitation project.
AvailableRehabilitation of wastewater gravity pipelines utilizing cured-in-place pipe and manhole rehabilitation.
Posted Date
Dec 23, 2025
Due Date
Feb 4, 2026
Release: Dec 23, 2025
Close: Feb 4, 2026
Rehabilitation of wastewater gravity pipelines utilizing cured-in-place pipe and manhole rehabilitation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis