Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
RFP for the demolition and construction of a building at Lincoln's New Salem Historic Site.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
RFP for the demolition and construction of a building at Lincoln's New Salem Historic Site.
Posted Date
Dec 10, 2025
Due Date
Jan 20, 2026
Release: Dec 10, 2025
Close: Jan 20, 2026
RFP for the demolition and construction of a building at Lincoln's New Salem Historic Site.
AvailablePremium
Access the largest public sector contact database
Shelter building and slab demolish and installation at bishop international airport.
Posted Date
Dec 8, 2025
Due Date
Dec 12, 2025
Release: Dec 8, 2025
Close: Dec 12, 2025
Shelter building and slab demolish and installation at bishop international airport.
DESIGN-BUILD: Shipping and Receiving Building. Construct a Shipping and Receiving Building. Primary facilities include the shipping and receiving facility with high bay warehouse space, administrative space, and loading dock, and organizational vehicle parking. Project includes building information systems, antiterrorism/force protection measure, fire protection and alarm systems, and Energy Monitoring Control Systems (EMCS) connection. Supporting facilities include utility (electric, water, sewer, and gas) connections, exterior lighting, paving, parking, storm drainage, landscaping, site improvements, and information systems. Post Construction Award Services (PCAS) will be included in the project. Heating and air conditioning will be provided by self-contained system. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided. Comprehensive building and furnishings-related interior design services are required. Access for individuals with disabilities will be provided. Cybersecurity Measures will be incorporated into this project. Sustainability/Energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Air Conditioning (Estimated 40 Tons).
Posted Date
Oct 27, 2025
Due Date
Nov 11, 2029
Release: Oct 27, 2025
Close: Nov 11, 2029
DESIGN-BUILD: Shipping and Receiving Building. Construct a Shipping and Receiving Building. Primary facilities include the shipping and receiving facility with high bay warehouse space, administrative space, and loading dock, and organizational vehicle parking. Project includes building information systems, antiterrorism/force protection measure, fire protection and alarm systems, and Energy Monitoring Control Systems (EMCS) connection. Supporting facilities include utility (electric, water, sewer, and gas) connections, exterior lighting, paving, parking, storm drainage, landscaping, site improvements, and information systems. Post Construction Award Services (PCAS) will be included in the project. Heating and air conditioning will be provided by self-contained system. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided. Comprehensive building and furnishings-related interior design services are required. Access for individuals with disabilities will be provided. Cybersecurity Measures will be incorporated into this project. Sustainability/Energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Air Conditioning (Estimated 40 Tons).
AvailableWork includes to provide construction services of a post or steel frame storage building.
Posted Date
Nov 24, 2025
Due Date
Dec 15, 2025
Release: Nov 24, 2025
Close: Dec 15, 2025
Work includes to provide construction services of a post or steel frame storage building.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis