Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Demolish and Construct Building.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construct proposed control building.
Posted Date
Dec 9, 2025
Due Date
Feb 6, 2026
Release: Dec 9, 2025
Close: Feb 6, 2026
Construct proposed control building.
AvailableWork include demolish buildings nos. 21 & 114.
Posted Date
Jan 22, 2026
Due Date
Feb 18, 2026
Release: Jan 22, 2026
Close: Feb 18, 2026
Work include demolish buildings nos. 21 & 114.
AvailableProcurement of full-service construction management services for an approximately 30,000 GSF Makerspace building for the College of Engineering.
Posted Date
Jan 22, 2026
Due Date
Feb 10, 2026
Release: Jan 22, 2026
Close: Feb 10, 2026
Procurement of full-service construction management services for an approximately 30,000 GSF Makerspace building for the College of Engineering.
AvailableDESIGN-BUILD: Shipping and Receiving Building. Construct a Shipping and Receiving Building. Primary facilities include the shipping and receiving facility with high bay warehouse space, administrative space, and loading dock, and organizational vehicle parking. Project includes building information systems, antiterrorism/force protection measure, fire protection and alarm systems, and Energy Monitoring Control Systems (EMCS) connection. Supporting facilities include utility (electric, water, sewer, and gas) connections, exterior lighting, paving, parking, storm drainage, landscaping, site improvements, and information systems. Post Construction Award Services (PCAS) will be included in the project. Heating and air conditioning will be provided by self-contained system. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided. Comprehensive building and furnishings-related interior design services are required. Access for individuals with disabilities will be provided. Cybersecurity Measures will be incorporated into this project. Sustainability/Energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Air Conditioning (Estimated 40 Tons).
Posted Date
Oct 27, 2025
Due Date
Nov 11, 2029
Release: Oct 27, 2025
Close: Nov 11, 2029
DESIGN-BUILD: Shipping and Receiving Building. Construct a Shipping and Receiving Building. Primary facilities include the shipping and receiving facility with high bay warehouse space, administrative space, and loading dock, and organizational vehicle parking. Project includes building information systems, antiterrorism/force protection measure, fire protection and alarm systems, and Energy Monitoring Control Systems (EMCS) connection. Supporting facilities include utility (electric, water, sewer, and gas) connections, exterior lighting, paving, parking, storm drainage, landscaping, site improvements, and information systems. Post Construction Award Services (PCAS) will be included in the project. Heating and air conditioning will be provided by self-contained system. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided. Comprehensive building and furnishings-related interior design services are required. Access for individuals with disabilities will be provided. Cybersecurity Measures will be incorporated into this project. Sustainability/Energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Air Conditioning (Estimated 40 Tons).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis