Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes but is not limited to grading, erosion control, utility installation, concrete improvements, asphalt paving, striping and signage, traffic control and any and all other work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This solicitation (District 3 Roadway Rehabilitation Phase 2) requests proposals for roadway rehabilitation work in Louisiana. The buyer-managed posting shows the solicitation was published 2026-01-16 and closes 2026-02-12 at 02:00 PM CST; detailed documents and contact information require registration to access. The posting is a public construction procurement (not a grant) and is currently open as of 2026-01-18.
Posted Date
Jan 16, 2026
Due Date
Feb 12, 2026
Release: Jan 16, 2026
Close: Feb 12, 2026
This solicitation (District 3 Roadway Rehabilitation Phase 2) requests proposals for roadway rehabilitation work in Louisiana. The buyer-managed posting shows the solicitation was published 2026-01-16 and closes 2026-02-12 at 02:00 PM CST; detailed documents and contact information require registration to access. The posting is a public construction procurement (not a grant) and is currently open as of 2026-01-18.
AvailableRemove existing bridge J0291 on state highway 84 and replace with a 175' long triple barrel concrete culvert (12' wide x 9' tall openings).
Posted Date
Jan 9, 2026
Due Date
Feb 18, 2026
Release: Jan 9, 2026
Close: Feb 18, 2026
Remove existing bridge J0291 on state highway 84 and replace with a 175' long triple barrel concrete culvert (12' wide x 9' tall openings).
AvailableContract provides for: the replacement of the existing CPKC bridge over Blue Ridge Blvd., with a four span double cell box girder bridge supported on h-pile bents. The project also includes the widening of the Blue Ridge Blvd. from 3rd Street to Grandview Road. The project also includes the extension of the RCB under Blue Ridge Blvd. Finally, the project includes the widening of the CPKC tracks embankment for the located CPKC mainline track. With this project this includes, the associated clearing and grubbing, excavation, backfill, seeding, erosion control measures, construction staking and existing culvert cleanout.
Posted Date
Jan 5, 2026
Due Date
Feb 4, 2026
Release: Jan 5, 2026
Close: Feb 4, 2026
Contract provides for: the replacement of the existing CPKC bridge over Blue Ridge Blvd., with a four span double cell box girder bridge supported on h-pile bents. The project also includes the widening of the Blue Ridge Blvd. from 3rd Street to Grandview Road. The project also includes the extension of the RCB under Blue Ridge Blvd. Finally, the project includes the widening of the CPKC tracks embankment for the located CPKC mainline track. With this project this includes, the associated clearing and grubbing, excavation, backfill, seeding, erosion control measures, construction staking and existing culvert cleanout.
AvailableConstruction of a 5-lane roadway with 4-12' travel lanes separated by a 15' median including a 4' bike lane and 5-foot concrete sidewalks in each direction. In addition, the project includes the construction of curb and gutter, closed drainage installation, hot mix asphalt paving, culvert construction, demolition, grading, earthwork, signing, and pavement markings.
Posted Date
Jan 16, 2026
Due Date
Feb 18, 2026
Release: Jan 16, 2026
Close: Feb 18, 2026
Construction of a 5-lane roadway with 4-12' travel lanes separated by a 15' median including a 4' bike lane and 5-foot concrete sidewalks in each direction. In addition, the project includes the construction of curb and gutter, closed drainage installation, hot mix asphalt paving, culvert construction, demolition, grading, earthwork, signing, and pavement markings.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →