This project will replace roof sections A, B, C, D, G, J and I at the College of Design and install a preformed silicone elastomer extrusion over the metal frame of the existing acrylic barrel vault. Sections A, B, C and D work includes but is not limited to; removal and disposal of the existing roof system down to the concrete roof deck including EPDM, coverboard, rigid insulation, gyp board and vapor barrier. Clean and prepare concrete deck for installation of new roof system including fully adhered 90 mil EPDM roof membrane over adhered coverboard, taper insulation, rigid insulation, vapor barrier and mechanically fastened prime thermal board over concrete deck. Sections G, J, and I work includes but is not limited to; removal and disposal of the existing roof system down to the metal roof deck including rock ballast, cast walk pavers, EPDM, coverboard, rigid insulation, gyp board and vapor barrier. Clean and prepare concrete deck for installation of new roof system including fully adhered 90 mil EPDM roof membrane over adhered high density coverboard, taper insulation, rigid insulation, vapor barrier and mechanically fastened prime thermal board over metal deck. Barrel vault work includes but is not limited to; removal and replacing sealant along metal frame, cleaning, priming of metal frame and acrylic surfaces, and installation of preformed silicone extrusion over the metal frame.
Available