Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes all design services, development services, property acquisition (if necessary), site work, labor and material to design and construct a wastewater collection system, with pump stations as necessary.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Tuscarora Township (Indian River, MI) requests proposals to operate the wastewater treatment plant and collection system for a three‑year period from March 1, 2026 through February 28, 2029. The contractor must provide at least a Michigan Class B municipal wastewater operator manager, perform daily staffing (M‑F), 24/7 on‑call response, compliance sampling/analysis, reporting, maintenance, biosolids handling, and coordination with ongoing sewer expansion work. Proposals are due January 31, 2026 at 11:59 AM local time, with the solicitation published December 31, 2025.
Posted Date
Dec 31, 2025
Due Date
Jan 31, 2026
Release: Dec 31, 2025
Close:
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Tuscarora Township (Indian River, MI) requests proposals to operate the wastewater treatment plant and collection system for a three‑year period from March 1, 2026 through February 28, 2029. The contractor must provide at least a Michigan Class B municipal wastewater operator manager, perform daily staffing (M‑F), 24/7 on‑call response, compliance sampling/analysis, reporting, maintenance, biosolids handling, and coordination with ongoing sewer expansion work. Proposals are due January 31, 2026 at 11:59 AM local time, with the solicitation published December 31, 2025.
AvailableWork includes wastewater treatment facilities rehabilitation for the installation/replacement/repair of mechanical, civil, structural, electrical, and instrumental & control equipment, programming, emergency repairs, pre/post construction services, and engineering design services as requested at city wastewater treatment facilities. Installations and/or replacement of mechanical equipment, such as but not limited to, pumps, motors, chemical storage tanks, chemical feed equipment and piping, valves and/or actuators that will improve flexibility and operational efficiency of the facility. See attached file.
Posted Date
Jan 13, 2026
Due Date
Jan 30, 2026
Release: Jan 13, 2026
Close: Jan 30, 2026
Work includes wastewater treatment facilities rehabilitation for the installation/replacement/repair of mechanical, civil, structural, electrical, and instrumental & control equipment, programming, emergency repairs, pre/post construction services, and engineering design services as requested at city wastewater treatment facilities. Installations and/or replacement of mechanical equipment, such as but not limited to, pumps, motors, chemical storage tanks, chemical feed equipment and piping, valves and/or actuators that will improve flexibility and operational efficiency of the facility. See attached file.
AvailableOperates one (1) wastewater treatment plant with a permitted annual average daily flow of 9.5 mgd and capacity of 10.45 mgd three month average daily flow (tmadf), approx. 420 miles of gravity sewer collection system, 197 wastewater lift stations, and about 40 miles of force mains which have been in service since the 1970s.
Posted Date
Dec 8, 2025
Due Date
Jan 27, 2026
Release: Dec 8, 2025
Close: Jan 27, 2026
Operates one (1) wastewater treatment plant with a permitted annual average daily flow of 9.5 mgd and capacity of 10.45 mgd three month average daily flow (tmadf), approx. 420 miles of gravity sewer collection system, 197 wastewater lift stations, and about 40 miles of force mains which have been in service since the 1970s.
AvailableSeeking engineering services for a comprehensive wastewater facilities plan.
Posted Date
Jan 5, 2026
Due Date
Feb 18, 2026
Release: Jan 5, 2026
Close: Feb 18, 2026
Seeking engineering services for a comprehensive wastewater facilities plan.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →