Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of installation of approx. 1,650 LF of 24", 9,900 LF of 20", and 16,900 LF of 16" force mains. Expansion of pump station which includes: splitter box, screening, wet well with two (2) 60-hp submersible pumps, valve vault and associated appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consist of relocate the phase i package headworks, install two (2) new equalization (EQ) basins with associated pump station, install two (2) new aeration basins including fine bubble diffusers, a selector tank, and a swing zone, install one (1) new 75' diameter secondary clarifier, modify the existing (phase I) RAS pump station, install new (phase II) RAS pump station, install two (2) new disc filters, expand effluent pump station, upgrade the existing aerobic digestion tank with new equipment and decant system, convert existing digester decant wet well pump station to duplex sludge transfer pump station. See attached bid ad.
Posted Date
Dec 14, 2025
Due Date
Jan 29, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 29, 2026
Work consist of relocate the phase i package headworks, install two (2) new equalization (EQ) basins with associated pump station, install two (2) new aeration basins including fine bubble diffusers, a selector tank, and a swing zone, install one (1) new 75' diameter secondary clarifier, modify the existing (phase I) RAS pump station, install new (phase II) RAS pump station, install two (2) new disc filters, expand effluent pump station, upgrade the existing aerobic digestion tank with new equipment and decant system, convert existing digester decant wet well pump station to duplex sludge transfer pump station. See attached bid ad.
AvailableThis RFP is for the construction of the First Avenue Pump Station, including sewer main force, gravity sewer main, duplex sewage pumping station, site demolition, and site improvements.
Posted Date
Dec 15, 2025
Due Date
Jan 21, 2026
Release: Dec 15, 2025
Close: Jan 21, 2026
This RFP is for the construction of the First Avenue Pump Station, including sewer main force, gravity sewer main, duplex sewage pumping station, site demolition, and site improvements.
AvailableProcurement for the installation of a sewer lift station and sewer force main.
Posted Date
Jan 4, 2026
Due Date
Feb 6, 2026
Release: Jan 4, 2026
Close: Feb 6, 2026
Procurement for the installation of a sewer lift station and sewer force main.
AvailableReplacement of pump instrumentation, air relief valves, hydropneumatic air compressor, motor control center (MCC), main switch board (MSB), electrical services meter main, harmonic filters, variable frequency drives (VFDs), and ductile iron piping; coating rehabilitation, installation of safety features for underground vault accessibility, site pavement reconstruction, and sewer manhole improvements.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
Replacement of pump instrumentation, air relief valves, hydropneumatic air compressor, motor control center (MCC), main switch board (MSB), electrical services meter main, harmonic filters, variable frequency drives (VFDs), and ductile iron piping; coating rehabilitation, installation of safety features for underground vault accessibility, site pavement reconstruction, and sewer manhole improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →