Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The bid proposal is being requested for installation of a standing seam metal roof on the Emergency Services building on Main Street.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Installing new flute fill insulation/TPO roofing system with contour ribs over existing standing seam metal roof. The civic center has a roof area of approximately 28,972 square feet. This project also includes removal of a skylight and in-fill with wood framing. An existing gas exhaust flue located at northeast end of roof will be removed. A new exhaust flue will be installed at the mechanical room and exit through the exterior wall. Existing lightning protection will be removed and reinstalled.
Posted Date
Nov 17, 2025
Due Date
Dec 18, 2025
Release: Nov 17, 2025
Close: Dec 18, 2025
Installing new flute fill insulation/TPO roofing system with contour ribs over existing standing seam metal roof. The civic center has a roof area of approximately 28,972 square feet. This project also includes removal of a skylight and in-fill with wood framing. An existing gas exhaust flue located at northeast end of roof will be removed. A new exhaust flue will be installed at the mechanical room and exit through the exterior wall. Existing lightning protection will be removed and reinstalled.
Premium
Access the largest public sector contact database
Project includes installing new PVC membrane over an existing metal roof system of approx. 3,130 SF. An alternate bid includes removing and replacing existing standing seam metal roof with new Standing seam metal roof.
Posted Date
Nov 14, 2025
Due Date
Jan 13, 2026
Release: Nov 14, 2025
Close: Jan 13, 2026
Project includes installing new PVC membrane over an existing metal roof system of approx. 3,130 SF. An alternate bid includes removing and replacing existing standing seam metal roof with new Standing seam metal roof.
AvailableThe base bid consists of the installation of a new PVC membrane over the existing metal roof system of approx. 3,130 SF. Alternate Bid 1 is to remove and replace existing standing seam metal roof with new standing seam metal roof.
Posted Date
Nov 24, 2025
Due Date
Jan 13, 2026
Release: Nov 24, 2025
Close: Jan 13, 2026
The base bid consists of the installation of a new PVC membrane over the existing metal roof system of approx. 3,130 SF. Alternate Bid 1 is to remove and replace existing standing seam metal roof with new standing seam metal roof.
AvailableWork includes : removal and replacement of the entire standing seam metal roof.
Posted Date
Sep 11, 2025
Due Date
Jan 6, 2026
Release: Sep 11, 2025
Close: Jan 6, 2026
Work includes : removal and replacement of the entire standing seam metal roof.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis