Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide stair treads
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
84 EA Pre-cast stair treads per attached drawings and specifications *43" long *9" x 5" x 1/4" embedded steel plates and 1" stud to be galvanized.
Posted Date
Dec 2, 2025
Due Date
Dec 19, 2025
Release: Dec 2, 2025
Close: Dec 19, 2025
84 EA Pre-cast stair treads per attached drawings and specifications *43" long *9" x 5" x 1/4" embedded steel plates and 1" stud to be galvanized.
AvailablePremium
Access the largest public sector contact database
Replacement of Stair Treads. The scope of work shall include, but not be limited to, the following principal items of work: 1. Protection of all existing building elements, site elements, building occupants, visitors and employees. Contractor shall be solely responsible for construction safety means and methods and access into the occupied building. 2. Selective demolition. Patch and fill all surfaces as needed to prepare for new work. 3. Restore all damaged surfaces or finishes resulting from the work and match existing adjacent construction and finish. Restore and repair all structural stair treads and landings per the construction drawing notes and details. 4. Secure all needed permits, perform all necessary testing, and coordinate all required safety procedures related to the work. 5. Supply and install new rubber stair treads. 6. Scrape and paint all stair risers and metal stringers.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
Close: Dec 18, 2025
Replacement of Stair Treads. The scope of work shall include, but not be limited to, the following principal items of work: 1. Protection of all existing building elements, site elements, building occupants, visitors and employees. Contractor shall be solely responsible for construction safety means and methods and access into the occupied building. 2. Selective demolition. Patch and fill all surfaces as needed to prepare for new work. 3. Restore all damaged surfaces or finishes resulting from the work and match existing adjacent construction and finish. Restore and repair all structural stair treads and landings per the construction drawing notes and details. 4. Secure all needed permits, perform all necessary testing, and coordinate all required safety procedures related to the work. 5. Supply and install new rubber stair treads. 6. Scrape and paint all stair risers and metal stringers.
AvailableWork include stair tread replacement.
Posted Date
Dec 7, 2025
Due Date
Jan 13, 2026
Release: Dec 7, 2025
Close: Jan 13, 2026
Work include stair tread replacement.
AvailableProvide Step - Loop, Climbing Ladder, Stair.
Posted Date
Dec 10, 2025
Due Date
Dec 17, 2025
Release: Dec 10, 2025
Close: Dec 17, 2025
Provide Step - Loop, Climbing Ladder, Stair.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis