Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for the St. Paul Road Bridge Replacement, including furnishing materials, tools, equipment, and labor for constructing a box culvert, roadway, and drainage improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of St. Paul, Missouri is soliciting sealed bids for the St. Paul Road Bridge Replacement, a construction project that includes building a box culvert along with roadway and drainage improvements. Bids are due January 15, 2026 at 12:00 pm local time at St. Paul City Hall, and bidders must meet MoDOT qualification requirements; DBE participation is encouraged and standard public works wage and bonding provisions apply. The project improves safety and capacity by replacing the existing bridge and widening the roadway.
Posted Date
Dec 22, 2025
Due Date
Jan 15, 2026
Release: Dec 22, 2025
Close: Jan 15, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of St. Paul, Missouri is soliciting sealed bids for the St. Paul Road Bridge Replacement, a construction project that includes building a box culvert along with roadway and drainage improvements. Bids are due January 15, 2026 at 12:00 pm local time at St. Paul City Hall, and bidders must meet MoDOT qualification requirements; DBE participation is encouraged and standard public works wage and bonding provisions apply. The project improves safety and capacity by replacing the existing bridge and widening the roadway.
AvailableRelease: Dec 9, 2025
Close: Jan 6, 2026
Work includes bridge replacement.
AvailableWork includes replacement of the wiler road bridge with a new buried precast concrete structure.
Posted Date
Nov 14, 2025
Due Date
Jan 7, 2026
Release: Nov 14, 2025
Close: Jan 7, 2026
Work includes replacement of the wiler road bridge with a new buried precast concrete structure.
AvailableRelease: Dec 12, 2025
Close: Jan 7, 2026
Bridge replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →