Summary
870 sf demolish and remove asphalt and surfacing, 500 SF demolish and remove concrete surfacing, 4 ls cut and cap water lines, 30 ton transportation and disposal of demolition debris and recyclable metal to an approved landfill, 1 LS construction dewatering infrastructure, 10,0001 gallon transportation and disposal of construction dewatering water, 3,000 CY excavation within limits of excavation area and direct load or stockpiling, 3,400 ton transportation and disposal of impacted soil to subtitle d landfill, 1,700 ton transportation and disposal of clean soil to an approved receiving facility, 5,100 ton import offsite borrow, 3,000 CY place and compact offsite borrow within excavation extents.