Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction contract for Mill Creek Pump Station upgrades: replacement/upsizing of four drywell pumps (125 HP → 280 HP), VFD and PLC replacement, installation of HVAC and restroom, demolition of existing generator building and installation of a 1 MW natural-gas backup generator (owner-purchased) with steel platforms and new pad-mounted transformer, electrical upgrades, driveway and related site/civil work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes replacement and upsizing of existing 125-hp pumps to 280-hp pumps, replacement and upsizing of existing standby generator (from 400 kw to mkw natural gas-powered generator), replacement of variable frequency drives (vfds), platforms for generator and transformers, electrical upgrades, installation of hvac, rest room, and other miscellaneous improvements to the pump station
Posted Date
Oct 22, 2025
Due Date
Dec 16, 2025
Release: Oct 22, 2025
Close: Dec 16, 2025
Work includes replacement and upsizing of existing 125-hp pumps to 280-hp pumps, replacement and upsizing of existing standby generator (from 400 kw to mkw natural gas-powered generator), replacement of variable frequency drives (vfds), platforms for generator and transformers, electrical upgrades, installation of hvac, rest room, and other miscellaneous improvements to the pump station
AvailableImprovements to the existing Well No. 4 pump station; improvements to two existing booster pump stations; installation of a cathodic protection system at the existing Reservoir No. 2, along with miscellaneous electrical and control improvements; construction of a new treatment building, including sodium hypochlorite and polyphosphate injection systems.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Improvements to the existing Well No. 4 pump station; improvements to two existing booster pump stations; installation of a cathodic protection system at the existing Reservoir No. 2, along with miscellaneous electrical and control improvements; construction of a new treatment building, including sodium hypochlorite and polyphosphate injection systems.
The project includes site preparation and installation of one (1) above ground booster pump station and other appurtenances.
Posted Date
Nov 21, 2025
Due Date
Dec 19, 2025
Release: Nov 21, 2025
Close: Dec 19, 2025
The project includes site preparation and installation of one (1) above ground booster pump station and other appurtenances.
AvailableReplacement of three (3) existing sludge pumps with three (3) new piggyback style pumps; miscellaneous piping replacement; replacement of the existing ceiling mounted 3-way track crane with a ceiling mounted traveling bridge crane; replacement of the access door; installation of necessary electrical gear.
Posted Date
Nov 24, 2025
Due Date
Jan 6, 2026
Release: Nov 24, 2025
Close: Jan 6, 2026
Replacement of three (3) existing sludge pumps with three (3) new piggyback style pumps; miscellaneous piping replacement; replacement of the existing ceiling mounted 3-way track crane with a ceiling mounted traveling bridge crane; replacement of the access door; installation of necessary electrical gear.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis