Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Florida Department of Transportation (FDOT) is soliciting consultant professional services to design and prepare construction documents for a shared-use (multi-use) path along State Road 30 (US 98) in Bay County from Crooked Sound Drive to County Road 386, including design of pedestrian crossings and related roadway/guardrail evaluations. The work includes surveys, geotechnical investigations, environmental permitting, utility coordination, and preparation of plans/specifications for construction contract advertisement, and coordination with the Florida SUN Trail program. The solicitation is a professional services/contract procurement (not a grant) and was posted on FDOT’s advertisement portal with a response deadline of January 20, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of removing existing concrete sidewalk and driveways and constructing new concrete multi use path, and driveways. The work also includes installing drainage improvements, sidewalk ramps, metal handrail, scuppers, curb and gutter, signs, pavement markings, utility adjustments and relocations, and other related work.
Posted Date
Oct 6, 2025
Due Date
Jan 16, 2026
Release: Oct 6, 2025
Close: Jan 16, 2026
Work consists of removing existing concrete sidewalk and driveways and constructing new concrete multi use path, and driveways. The work also includes installing drainage improvements, sidewalk ramps, metal handrail, scuppers, curb and gutter, signs, pavement markings, utility adjustments and relocations, and other related work.
AvailableProject consists of construction of a 10\' wide multi-use path from Clark Memorial Park to north of the Rolling Greens Golf Course. Proposed improvement includes PCC sidewalk or HMA path, ditch grading, culvert and storm sewer drainage improvements/construction, and removal and construction of a bridge structure.
Posted Date
Dec 17, 2025
Due Date
Jan 13, 2026
Release: Dec 17, 2025
Close: Jan 13, 2026
Project consists of construction of a 10\' wide multi-use path from Clark Memorial Park to north of the Rolling Greens Golf Course. Proposed improvement includes PCC sidewalk or HMA path, ditch grading, culvert and storm sewer drainage improvements/construction, and removal and construction of a bridge structure.
AvailableProvide engineering and right-of-way acquisition services. Work includes planning, surveying, and designing of multi-use path projects, as well as the applicable/respective phase paperwork and procurement requirements and procedures.
Posted Date
Jan 5, 2026
Due Date
Jan 23, 2026
Release: Jan 5, 2026
Close: Jan 23, 2026
Provide engineering and right-of-way acquisition services. Work includes planning, surveying, and designing of multi-use path projects, as well as the applicable/respective phase paperwork and procurement requirements and procedures.
AvailableProject consists of 1 LS clearing and grubbing; 3,884 CY excavation; 6,399 CY subgrade compaction; 3,206 LF fence misc., wood fence; 40 LF fence rebuilt (split rail); 1,696 SF 4" concrete walk; 342 SF curb ramp; 46 CY rock channel protection, type b with aggregate filter; 4,483 SY seeding and mulching, class 1; 1,056 cy topsoil; 3,400 SY erosion control mat, type c; 830 CY ditch substrate installation (substrate 1); 1. 90 CY concrete masonry; 4 LF 4" conduit, type e; 1 ea manhole adjusted to grade; 530 SY pavement repair; 270 GAL tack coat; 205 CY asphalt concrete surface course.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
Project consists of 1 LS clearing and grubbing; 3,884 CY excavation; 6,399 CY subgrade compaction; 3,206 LF fence misc., wood fence; 40 LF fence rebuilt (split rail); 1,696 SF 4" concrete walk; 342 SF curb ramp; 46 CY rock channel protection, type b with aggregate filter; 4,483 SY seeding and mulching, class 1; 1,056 cy topsoil; 3,400 SY erosion control mat, type c; 830 CY ditch substrate installation (substrate 1); 1. 90 CY concrete masonry; 4 LF 4" conduit, type e; 1 ea manhole adjusted to grade; 530 SY pavement repair; 270 GAL tack coat; 205 CY asphalt concrete surface course.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis