Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Middlesex County
The services to be provided under this Contract shall include pre-purchase and delivery of six (6) variable frequency drives (VFDs) for the operation of the existing main pumps at pump station. Work shall include phased transportation, delivery, rigging and posterior manufacturer's onsite training for the drives. As well as startup, commissioning, testing, furnishing spare parts and performing maintenance services post installation.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Bayonne
Purchasing of twenty (20) pedestal sump pumps.
Posted Date
Oct 17, 2025
Due Date
Dec 4, 2025
Release: Oct 17, 2025
City of Bayonne
Close: Dec 4, 2025
Purchasing of twenty (20) pedestal sump pumps.
AvailableCity of Bellevue
Construct approx. 8,160 LF of ductile iron water mains and appurtenances, Install two (2) PRV Vault and Appurtenances, Install new fire hydrant assemblies, Install replacement water services, Relocate existing utilities (as required), Abandon asbestos cement pipe, Restore surface conditions, including asphalt trench patching, concrete curbs, gutters and sidewalks, Perform Traffic control, Other work as required to complete the project.
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
City of Bellevue
Close: Dec 18, 2025
Construct approx. 8,160 LF of ductile iron water mains and appurtenances, Install two (2) PRV Vault and Appurtenances, Install new fire hydrant assemblies, Install replacement water services, Relocate existing utilities (as required), Abandon asbestos cement pipe, Restore surface conditions, including asphalt trench patching, concrete curbs, gutters and sidewalks, Perform Traffic control, Other work as required to complete the project.
AvailableGreat Lakes Water Authority
Provide pump station 2 variable frequency drives (VFDs) upgrade at the water resource recovery facility, project includes replacement of sewage pump VFDs, rewinding of sewage pump motors, and electrical distribution system upgrades.
Posted Date
Jul 16, 2025
Due Date
Dec 2, 2025
Release: Jul 16, 2025
Great Lakes Water Authority
Close: Dec 2, 2025
Provide pump station 2 variable frequency drives (VFDs) upgrade at the water resource recovery facility, project includes replacement of sewage pump VFDs, rewinding of sewage pump motors, and electrical distribution system upgrades.
AvailableCity of Littleton
Owner's Representative to manage and oversee design and construction for the Main Street Improvements - Phase I of Project Downtown. The Owner’s Rep should bring expertise in project management, urban design coordination.
Posted Date
Oct 24, 2025
Due Date
Dec 9, 2025
Release: Oct 24, 2025
City of Littleton
Close: Dec 9, 2025
Owner's Representative to manage and oversee design and construction for the Main Street Improvements - Phase I of Project Downtown. The Owner’s Rep should bring expertise in project management, urban design coordination.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis