Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design, provide, install, and maintain appropriately certified Point-of Entry Treatment (POET) filter systems for homes on West Plains that have tested positive for per-and polyfluoroalkyl substances (PFAS) in their private water supply. This initiative is part of Spokane County’s response to PFAS contamination in drinking water and is aligned with the Washington State Department of Health (DOH), Department of Ecology (DOE), and Department of Commerce regulations and guidance.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Seeking a professional consulting engineering firm to complete a pre- liminary engineering report detailing the alternatives for eliminating PFAS in the source water.
Posted Date
Jan 10, 2026
Due Date
Jan 23, 2026
Release: Jan 10, 2026
Close: Jan 23, 2026
Seeking a professional consulting engineering firm to complete a pre- liminary engineering report detailing the alternatives for eliminating PFAS in the source water.
AvailableConstruction of water distribution system pipelines & components replacing existing water infrastructure consisting of approx 50,667 LF of 8" dia pipelines and 7,581 LF of 12" diameter pipelines. The project will include all pipes, associated valves, fittings hydrants, & water appurtenances, encasements, water service line & meter replacement, cutting & patching of streets, all testing, disinfection, swppp measures, traffic control.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Construction of water distribution system pipelines & components replacing existing water infrastructure consisting of approx 50,667 LF of 8" dia pipelines and 7,581 LF of 12" diameter pipelines. The project will include all pipes, associated valves, fittings hydrants, & water appurtenances, encasements, water service line & meter replacement, cutting & patching of streets, all testing, disinfection, swppp measures, traffic control.
The City of Avalon seeks statements of qualifications from design-builders to provide progressive design-build services for the Cabrillo Mole Revitalization Phase II project, including replacement and expansion of the ferry intermodal terminal. The successful proposer will execute the progressive design-build contract and deliver a modernized terminal meeting the City’s requirements.
Posted Date
Nov 17, 2025
Due Date
Jan 22, 2026
Release: Nov 17, 2025
Close: Jan 22, 2026
The City of Avalon seeks statements of qualifications from design-builders to provide progressive design-build services for the Cabrillo Mole Revitalization Phase II project, including replacement and expansion of the ferry intermodal terminal. The successful proposer will execute the progressive design-build contract and deliver a modernized terminal meeting the City’s requirements.
This Request for Qualifications is for pre-qualifying contractors for the replacement of approximately 2,500 meters of watermains and installation of approximately 1,400 meters of feedermain, including associated fittings, valves, hydrants, and private-side connection replacements.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
This Request for Qualifications is for pre-qualifying contractors for the replacement of approximately 2,500 meters of watermains and installation of approximately 1,400 meters of feedermain, including associated fittings, valves, hydrants, and private-side connection replacements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis