Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a splash pad facility. The project consists of the design, permitting, and construction of a splash pad, including all mechanical, electrical, plumbing, filtration, controls, spray features and surfacing. Demolition of the existing pool has already been completed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Renovations to an existing playspace. e Project will include the renovation of an existing splash pad and playground by late spring 2026.
Posted Date
Dec 24, 2025
Due Date
Jan 31, 2026
Release: Dec 24, 2025
Close: Jan 31, 2026
Renovations to an existing playspace. e Project will include the renovation of an existing splash pad and playground by late spring 2026.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Elk Grove Village is soliciting sealed bids to rehabilitate the sequencing equipment at the Village Green Splash Pad, including replacement of Crystal Fountains Choreoswitch and LED assemblies and related electrical components. The scope includes cleaning and reconditioning of junction boxes, integration with controls, and all testing and DMX addressing to return the system to full functionality. A mandatory pre-bid is scheduled for January 6, 2026 at 9:00 AM CST, and bids are due January 13, 2026 at 10:45 AM CST.
Posted Date
Dec 22, 2025
Due Date
Jan 13, 2026
Release: Dec 22, 2025
Close: Jan 13, 2026
Elk Grove Village is soliciting sealed bids to rehabilitate the sequencing equipment at the Village Green Splash Pad, including replacement of Crystal Fountains Choreoswitch and LED assemblies and related electrical components. The scope includes cleaning and reconditioning of junction boxes, integration with controls, and all testing and DMX addressing to return the system to full functionality. A mandatory pre-bid is scheduled for January 6, 2026 at 9:00 AM CST, and bids are due January 13, 2026 at 10:45 AM CST.
AvailableDESIGN-BUILD. Providing demolition of existing splash pad and a splash pad design and installation in connection with harry myers park splash pad. project is for the design and installation of an approximately 4,000 square feet facility area including seating area with sidewalk border around the splash pad with an approximate 2,000 SY splash pad
Posted Date
Dec 4, 2025
Due Date
Jan 7, 2026
Release: Dec 4, 2025
Close: Jan 7, 2026
DESIGN-BUILD. Providing demolition of existing splash pad and a splash pad design and installation in connection with harry myers park splash pad. project is for the design and installation of an approximately 4,000 square feet facility area including seating area with sidewalk border around the splash pad with an approximate 2,000 SY splash pad
Renovation and modernization of the community park splash pad, including demolition, mechanical system replacement, flatwork, utilities, and associated architectural and structural improvements. Landscape and irrigation installation and planting restoration.
Posted Date
Nov 24, 2025
Due Date
Jan 9, 2026
Release: Nov 24, 2025
Close: Jan 9, 2026
Renovation and modernization of the community park splash pad, including demolition, mechanical system replacement, flatwork, utilities, and associated architectural and structural improvements. Landscape and irrigation installation and planting restoration.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →